Peaks and Plains HQ, Macclesfield

Peaks and Plains HQ, Macclesfield

Peaks & Plains HQ, Macclesfield

PROJECT OVERVIEW

In the wake of their 10 year anniversary, the head office of Peaks and Plains Housing Trust underwent a transformational fit out programme.

The award wining project, designed by BAND Architects, involved the refurbishment of  the trust’s Ropewalks building to reflect the changing needs of their business.

The new layout of the offices reflects the vibrant communities that Peaks & Plains work with across Cheshire, by creating a homely feel whilst bringing together its core operations into a single working environment.

Hannan Associates were appointed as MEP Design consultants on the project alongside BAND Architects, Abacus Cost Management, Brown and Bancroft Interiors, JMC Contractors and Kinnarps Workspace Solutions.

We provided the outline design of the MEP Services and carried out a technical checking role for the client, reviewing both the detailed design of the Contractor and also the site installation works.

Our team ensured that our client’s interests were protected and their objectives realised by ensuring that the full operational requirements & functionality of the office was understood at an early stage and all elements were included within the tender package submitted. Our team remained open minded  and focussed on helping to create a better office environment for the trust’s staff.

We subsequently worked with the contractors to oversee any value engineering proposals to ensure that the project was delivered to budget but at the same time only high quality alternatives were accepted to complete the project in line with the overall vision the client was hoping to achieve.

About This Project

5

CLIENT : Peaks & Plains Housing Association

5

ARCHITECT : Band Architects

5

PROJECT VALUE : £800,000

5

CONTRACT DURATION: September 2016 - September 2017

Get in touch

4 + 4 =

No.1 Spinningfields Fit Out

No.1 Spinningfields Fit Out

No.1 Spinningfields – Squire Patton Bogg’s HQ Manchester

PROJECT OVERVIEW

We provided MEP Consultancy services for the fit out of international legal practice, Squire Patton Boggs new offices based in Manchester.

Our client occupied 27,500 sq ft of workspace in Allied London’s No.1 Spinningfields, constructed by BAM. We joined Gardiner and Theobald and Sheppard Robson on the project team.

The fit out works comprise reception, open plan and cellular offices, support areas, full catering kitchen, conference facility and server room.

Our duties included:

  • Due diligence review of the landlords design and specification
  • Assisting the client with the development of the fit out brief and specification
  • Liaison with the base build construction team
  • Stage 4 Design with 3D coordination of fit out package
  • Tender, review and negotiations
  • Construction monitoring

The Sustainability design features incorporated within the project included:

  • Lighting control for occupancy and daylight sensing
  • High efficiency EC motors on the fan coil units
  • Energy metering / monitoring
  • CHP

 

About This Project

5

CLIENT : Squire Patton Boggs

5

ARCHITECT : Sheppard Robson

5

PROJECT MANAGER : Gardiner & Theobald

5

PROJECT VALUE : £3 million

5

CONTRACT DURATION: October 2015 - December 2017

Get in touch

14 + 13 =

No.1 First Street, Manchester

No.1 First Street, Manchester

No.1 First Street, Manchester

PROJECT OVERVIEW

We were MEP Consultants for the refurbishment and fit out of the former BT building at Grand Island, now known as No. 1 First Street.

This seven-storey, 180,000 sq ft, Grade A, BREEAM Excellent office building became home to Manchester City Council during their 3 million sq ft masterplan development of the area around Whitworth Street West in the city centre of Manchester.

The building was designed to run independently or have the ability to connect to a borehole farm planned for the site.

ASK were highly satisfied with the services received and through professional recommendation Hannan Associates were awarded the Tenant Fit Out Design contract associated with occupation of the building by Manchester City Council during the refurbishment of Manchester Town Hall.

We have subsequently monitored a number of tenant fit outs on behalf of ASK Developments in No. 1 First Street including FCE Bank, Gazprom and Auto Trader.

About This Project

5

CLIENT : ASK Real Estate

5

ARCHITECT : BDP Architects

5

PROJECT VALUE : £35 million

5

CONTRACT DURATION: July 2007 – July 2009

Get in touch

12 + 12 =

Mann Island, Liverpool

Mann Island, Liverpool

Mann Island, Liverpool

PROJECT OVERVIEW

Situated between the ‘Three Graces’ and Albert Dock, Mann Island is a RIBA award-winning mixed-use development which reconnects Liverpool’s city centre to its historic waterfront.

Hannan Associates were responsible for the detail design of the Building Services systems, for the new commercial building within the complex. The building provides 172,000 sq ft of comfort cooled office space over 14 floors. The block is part of a scheme that opens up access to previously enclosed dockland areas, to create three new publics spaces, two fourteen-storey residential buildings, retail, leisure, and exhibition spaces.

Our involvement included the base build Category A works to meet the Development brief and the Category B fit out to meet the requirements of Mersey Travel which includes an exhibition space on the ground floor.

The internal environment is controlled by a highly efficient VRF comfort cooling system, which incorporates renewable energy content. The design achieved BREEAM Excellent rating and won a 2015 RIBA North West Award.

Awards

2015 RIBA North West Award Winner

About This Project

5

CLIENT : Smith Group

5

ARCHITECT : Broadway Malyan

5

PROJECT VALUE : £18 million

5

CONTRACT DURATION: 2009 – 2010

Get in touch

3 + 13 =

Lingley Mere Business Park, Warrington

Lingley Mere Business Park, Warrington

Lingley Mere Business Park, Warrington

PROJECT OVERVIEW

Lingley Mere is an established business park in the North West, which is currently home to over 3,000 office workers and is to be taken forward under a masterplanned development programme to provide 1.25m sq ft of business space and related amenity facilities within an outstanding landscaped environment.

We provided the following services:

 

  • Site wide infrastructure duties
  • Performance duties for 4 no. office buildings comprising of 50,000 sq ft of office accommodation.
  • Detailed design duties for the design of the new ODPM Fire Control Centre
  • Performance duties for the design of a 46,607 sq foot three storey Contact Centre
  • Feasibility studies for the development of a Hotel scheme, Amenity Building and another small office building

    About This Project

    5

    CLIENT : Muse Developments

    5

    ARCHITECT : Leach Rhodes Walker

    5

    PROJECT VALUE : £200 M

    5

    CONTRACT DURATION: 2003 – 2009

    Get in touch

    6 + 10 =

    Pin It on Pinterest