No. 11 York Street

No. 11 York Street

No. 11 York Street

 

PROJECT OVERVIEW

We worked with Kier Property and AHR Architects, for the redevelopment of 40 Fountain Street in Manchester City Centre. The new Grade A office building has been renamed as 11 York Street, and is designed to target the commercial, professional and financial services office sector.

Works comprise the demolition of an existing five-storey office building, and the construction of a new 79,000 sq ft, eight-storey building which incorporates double height main entrance lobby, private business lounge, 2nr ground floor retail units finished to shell specification and basement car parking.

The building has been designed to achieve BREEAM ‘Excellent rating as measured under BREEAM 2011 New Construction criteria, also achieving an ‘A’ Rated EPC. The MEP services installations have been designed in accordance with BCO Recommendations to maximise the flexibility of the CAT A open plan office space and to facilitate the possible sub-division of the floor plates into two independent tenancy areas, on a floor-by-floor basis.

As Kier Property’s retained MEP Consultant, we reviewed construction information and visited site regularly to report quality of MEP services installations.

 

About This Project

5

CLIENT : Kier Property

5

ARCHITECT : AHR Architects

5

PROJECT VALUE : £13 million

5

CONTRACT DURATION: 2012 - 2021

Get in touch

10 + 9 =

MUFC Old Trafford

MUFC Old Trafford

MUFC Old Trafford Stadium

PROJECT OVERVIEW

Hannans have been involved in various projects for Manchester United Football Club over the last 25 years. Ongoing Duties have included, Detailed Design, Infrastructure Services, Major Services Diversions, Monitoring, Surveys, Maintenance, Energy Performance Certificates and Condition Reports.

Quadrants Extension

One of the most recent projects at old Trafford was the Quadrants Development, which involved the infill of the North East and North West Quadrants, for which we provided Detailed Design Services.  This development provided additional spectator terracing of 7,000 extra seats and 2,300 extra places for corporate dining. The design was complicated by the myriad of existing buried services which needed to be diverted to accommodate the piling required for the structure.

About This Project

5

CLIENT : Manchester United Football Club

5

ARCHITECT : Miller Partnership & Marshall Kypriadis Architects

5

PROJECT VALUE : £42 million

5

CONTRACT DURATION: Various Projects 1990 – Ongoing

Executive Boxes

We provided MEP Detailed Design Services for the East and West stand redevelopment at Old Trafford, which involved building behind and over the existing stands. This development provided additional spectator terracing of 16,000 extra seats. The design was complicated by the myriad of existing buried services which needed to be diverted or planned around to accommodate the piling required for the structure.  There were a number of buildings demolished and roads diverted.  No seats were lost during the development and early handover was achieved by working in partnership with the design and build contractors. The scheme included new executive boxes, new club offices, disabled facilities, new upper concourses terracing and roof installations.

Get in touch

5 + 2 =

The Clayworks, Smithfield Stoke

The Clayworks, Smithfield Stoke

The Clayworks, Stoke Smithfield PRS Scheme

PROJECT OVERVIEW

The Clayworks is a build to rent residential apartment scheme developed by Genr8 Developments in partnership with Stoke City Council as part of the wider £170M redevelopment of the heart of Stoke-on-Trent.

The Hannan residential team provided Stage 3 Building Services Design and specification together with construction supervision duties for the 11-storey apartment block, which provides 151 build to rent one and two bed apartments, providing much needed living space in a central location.

The residential development, which is now half let, also features co-working space, function rooms, cycle storage and a roof top terrace with BBQ facilities.

The name Clayworks is a nod to the city’s history of potteries production for centuries.

The overall masterplan will provide the crucial link between existing residential, shopping, cultural and heritage areas helping to bring the city together more coherently.

We worked alongside Cartwright Pickard Architects, Planit IE and Buro Happold on the design team and Willmott Dixon has been appointed as the main contractor.

 

The Smithfield Scheme Transforming the Future of Stoke

 

About This Project

5

CLIENT : Genr8 Developments

5

ARCHITECT : Cartwright Pickard Architects

5

PROJECT VALUE : £170 million

5

CONTRACT DURATION: October 2015 - October 2020

Get in touch

9 + 7 =

Rochdale Riverside

Rochdale Riverside

Rochdale Riverside

 

PROJECT OVERVIEW

We are part of the team working to deliver Rochdale Riverside, one of several projects undertaken as part of Rochdale Council’s town centre masterplan. The scheme is part of a joint venture between Genr8 Developments and Kajima, in collaboration with Rochdale Development Agency and Rochdale council. The main contractor for the development is Willmott Dixon.

Completed in April 2020, the first phase of Rochdale Riverside includes a new 200,000 sq ft retail and leisure quarter where occupiers include Marks and Spencer,  H&M, JD Sorts, River Island, Next, New Look and Boots. The retail complex also features a six-screen Reel Cinema and Hollywood Bowl Puttstars. Submitted plans for phase 2 include two apartment blocks of nine storeys, a 147-bedroom hotel and 43,000 sq ft of offices.

Our engineers are providing building services engineering consultancy for the base build shell, core elements and landlord’s areas, including thermal modelling and Part L analysis for each of the buildings. We are also providing BREEAM Assessment duties for the project.

Hannan Associates have worked closely with other members of the design team to develop innovative, landmark buildings, with effective and efficient building services solutions to meet the needs for each particular building.
Due to the nature of the development and location of the site, our role has also involved extensive dialogue and negotiations with all utility providers in the area, to deal with the extensive major utility diversions that will be necessary on and around the site, as well as dealing with the new supply connection requirements.

Hannan Associates are extremely proud and excited to be working with Genr8 and the rest of the team on this project which is transforming Rochdale’s retail and commercial landscape and giving its residents a town centre they can be proud of.

Rochdale Riverside Update

Regenerating Rochdale

Progress Rochdale Riverside

About This Project

5

CLIENT : Genr8 Developments & Arcadis

5

ARCHITECT : T P Bennett Partnership

5

PROJECT VALUE : £50 million

5

CONTRACT DURATION: October 2014 – Ongoing

Get in touch

2 + 2 =

No.2 New Bailey, Salford

No.2 New Bailey, Salford

No.2 New Bailey, Salford

PROJECT OVERVIEW

No. 2 New Bailey is the second new office building at Salford Central’s New Bailey development. This 188,500 sq ft office building is the first scheme designed by architects Alford Hall Monaghan Morris in Greater Manchester.

The 11-storey building includes CAT A open plan office across 10 floors, commercial unit space at ground floor, basement car parking, external roof terrace and a public square and is on target to achieve an A rated Energy Performance Certificate, a BREEAM Excellent rating along with a Wired Score rating of Platinum.

Hannan Associates provided Building Services Engineering Consultancy and BREEAM Assessment for the development.

Each floor is designed to be sub-divided into two separate tenancies, each area provided with a private external balcony. Simultaneous Variable Refrigerant Flow heating & cooling systems are provided to each tenancy, mechanical fresh air ventilation from roof mounted air handling plant incorporating heat recovery, which offers good flexibility and is easily adaptable to cope with sub-division and high occupant density.

The client’s design aspirations included exposed services with acoustic rafts to conceal the indoor VRF units and improve the acoustics of the open plan office space.

Eversheds Sutherland are taking approximately 50,000 sq ft across the part 8th, 9th and 10th floors with BLM LLP signed to occupy first to fourth floors .

The project is being backed by the English Cities Fund (tECF) – a joint venture between Muse, Legal and General and Homes England.

About This Project

5

CLIENT : Muse & English Cities Fund

5

ARCHITECT : Allford Hall Monaghan Morris

5

PROJECT VALUE : £35 million

5

CONTRACT DURATION: 2016 – 2020

Get in touch

9 + 7 =