Stockport Exchange Redevelopment

Stockport Exchange Redevelopment

Stockport Exchange 

PROJECT OVERVIEW

Stockport Exchange is an award winning, high-quality office quarter, with attractive public realm; car parking;  a hotel and retail units next to Stockport Train Station. We have been part of Muse’s team for the development for the last 13 years.

Our duties for each phase have included:

o Building Services Engineering

o BREEAM assessment

o Utilities Infrastructure for the site

o Passive Design Analysis

o Energy and Sustainability Support

o Part L2A Compliance Report

Phase 11,000 space multi-storey car park

Phase 2 –  No.1 Stockport Exchange – a 50,000 sq ft office building; a 115 bedroom Holiday Inn Express Hotel, a new pedestrianized public space outside the train station and a new reconfigured road layout to improve station access.

Phase 3 No.2 Stockport Exchange – a 60,000 sq ft, Grade A office. Design features include photovoltaic panels, LED lighting and ultra-low water consuming fittings. The use of natural daylight and enhanced fabric minimises the building’s carbon emissions. Our analysis of the scheme included the consideration of connecting the development to Stockport’s proposed heat network.

Phase 4No. 3 Stockport Exchange  – a 64,000 sq ft Grade A office and 399-space multi-storey car park. The office building has been designed to achieve BREEAM ‘Excellent’ and an EPC A rating. Low energy features include LED lighting, high efficiency VRF heating & cooling and heat recovery ventilation. Tenant facilities include cycle racks, showers, lockers and a communal roof terrace.

Phase 5No. 4 Stockport Exchange – a 60,000 sq ft Grade A office with ground floor space for shops, cafes, bars or restaurants as well as a fully accessible landscaped approach to the train station which is currently at design stage.

Future phases will include an additional 185,000 sq ft of office space and up to 100 residential apartments.

All the buildings have been designed to achieve a BREEAM Excellent rating.

Muse are Stockport Council’s development partner for Stockport Exchange, which forms part of the council’s wider £1bn town centre regeneration plan for Stockport.

Other members of the project team have included: RWHL Architects, Ryder Architecture, Sheppard Robson, RPS Group, Gillespies, Buro Four, Curtins Consulting.

 

2 Stockport Exchange Complete

 

About This Project

5

CLIENT : Muse

5

ARCHITECTS : Sheppard Robson; Ryder Architecture; & RWHL Architects

5

PROJECT VALUE : £145 approximately

5

CONTRACT DURATION: 2011 - ongoing

Get in touch

2 + 7 =

One Angel Square, Manchester

One Angel Square, Manchester

One Angel Square, Manchester

PROJECT OVERVIEW

Hannans are very pleased to have been part of the team who designed the MEP Services for the 320,000 sq ft Co-operative Group Headquarters building – One Angel Square. 

Opened by the Queen on 14th November 2013, the new head office at One Angel Square Manchester was at the time officially the world’s greenest office building, with a BREEAM score of 95.16% – ‘Outstanding.’

The design of the building was driven by the Co-operative Group’s desire to create a Carbon Negative building. The sixteen storey office building was designed to achieve a BREEAM Outstanding rating, as well as an EPC ‘A’ rated near zero carbon building, with cutting edge integrated design.

The services design included 3D modelling, together with building modelling and dynamic simulation to calculate and assess the buildings energy consumption and potential EPC and DEC ratings.

The project has won numerous honors including both Design & Innovation, and Overall Project of the Year at the 2013 RICS Awards, BCO 2013 Corporate workplace of the year, Property Week 2012 Sustainability Achievement Award, and a 2013 BREEAM Award.

About This Project

5

CLIENT : The Co-Operative Group

5

ARCHITECT : 3D Reid

5

PROJECT VALUE : £100 million

5

CONTRACT DURATION: 2009 - 2013

Ian Joyce

Ian Joyce

Director

Email: [email protected]
Phone: +44(0)161 337 2200
Awards

2011

Considerate Constructors Scheme Gold Award Builder & Engineer Awards Sustainable Project of the Year

2012

Green Apple Awards Bronze Award Property Week Awards Sustainable Achievement Award World Architecture Festival Future Project Office Shortlisted

2013

BREEAM Awards Best Office Building MIPIM Awards Best Office and Business Development National RICS Awards Project of the year National RICS Awards Design & Innovation award BCO Awards Coperate Workplace of the Year Manchester Society of Architects Awards Winner

Get in touch

1 + 9 =

Vision Tameside, Manchester

Vision Tameside, Manchester

Vision Tameside, Manchester

PROJECT OVERVIEW

We are very pleased to have been a part of the team who delivered Phase 2 of the ‘Vision Tameside’ master plan set to transform Ashton Town Centre. We have been undertaking the detailed design of the MEP Services and Infrastructure, as part of which we are assisting the Council with their environmental services strategy to help them meet their aspirations to create a sustainable building.

The Tameside One development includes a new Advanced Skills Centre for Tameside College alongside a new Joint Service Centre for the Council and others partners.

The 7,000sqm Advanced Skills Centre provides a new learning and skills centre for students studying vocational subjects including: hair and beauty, hospitality and catering, bakery and confectionery, travel and tourism and business skills.

The 6,000sqm Joint Service Centre incorporates a library, customer service centre, committee and training rooms and office accommodation for the Council and partners.

This phase of the development also includes a 2,150sq.m retail space for a Wilko’s store.

 

Photos by Agent Marketing

 

Tameside One Complete

 

About This Project

5

CLIENT : Tameside Council and Robertson

5

ARCHITECT : Ryder

5

PROJECT VALUE : £36 million

5

CONTRACT DURATION: 2014 – 2019

Get in touch

12 + 1 =

Omega Business Park, Warrington

Omega Business Park, Warrington

Omega Warrington

PROJECT OVERVIEW

Over a ten year period we provided site wide utilities strategy information and MEP contribution for the master planning proposals, utilities infrastructure appraisal, design and procurement for this 775 acre mixed use development, which includes around around 2.5m sq ft of logistics space, a mixed use retail & leisure park, parkland and plans for 1,400 new homes.

Omega is home to Brakes, Hermes Parcelnet, Travis Perkins, Asda, the Hut Group, Plastic Omnium, Amazon, Dominoes, Royal Mail and the Delivery Group.

The 226 ha site straddling the M62 (J8) near Warrington comprises a large part of the former RAF/ USAF Burtonwood Airbase.

Our role included providing MEP Consultancy Services for performance design, tender & installation duties for all Cat A works across the scheme to date, together with Cat B works in the majority of the units for the integral offices and associated support accommodation. 

Other duties included planning submission support, BREEAM assessment, utilities provisions for the tenant developed plots and pre and post exchange tenant liaison for the utilities.

We  have also provided technical support on site stage progress and quality monitoring, through to completion/handover stage, for all of the OWL developed buildings on the North and South sites

The Hannan industrial team is very proud to have contributed toward the outstanding success of Omega Warrington over the last ten years and look forward to any future development on the site.

Omega is being delivered by Omega Warrington Ltd (OWL) in partnership with landowner the Homes and Communities Agency and supported by Warrington Borough Council and the Cheshire and Warrington LEP.

About This Project

5

CLIENT : Miller Developments

5

ARCHITECT : Chetwood Architects

5

PROJECT VALUE : £1 Billion

5

CONTRACT DURATION: 2012 - 2022

For further details of our work at Omega Business Park and other industrial projects please click here:

Get in touch

11 + 11 =

No.1 Spinningfields Fit Out

No.1 Spinningfields Fit Out

No.1 Spinningfields – Squire Patton Bogg’s HQ Manchester

PROJECT OVERVIEW

We provided MEP Consultancy services for the fit out of international legal practice, Squire Patton Boggs new offices based in Manchester.

Our client occupied 27,500 sq ft of workspace in Allied London’s No.1 Spinningfields, constructed by BAM. We joined Gardiner and Theobald and Sheppard Robson on the project team.

The fit out works comprise reception, open plan and cellular offices, support areas, full catering kitchen, conference facility and server room.

Our duties included:

  • Due diligence review of the landlords design and specification
  • Assisting the client with the development of the fit out brief and specification
  • Liaison with the base build construction team
  • Stage 4 Design with 3D coordination of fit out package
  • Tender, review and negotiations
  • Construction monitoring

The Sustainability design features incorporated within the project included:

  • Lighting control for occupancy and daylight sensing
  • High efficiency EC motors on the fan coil units
  • Energy metering / monitoring
  • CHP

 

About This Project

5

CLIENT : Squire Patton Boggs

5

ARCHITECT : Sheppard Robson

5

PROJECT MANAGER : Gardiner & Theobald

5

PROJECT VALUE : £3 million

5

CONTRACT DURATION: October 2015 - December 2017

Get in touch

10 + 3 =

Pin It on Pinterest