Riverside House, New Bailey Salford

Riverside House, New Bailey Salford

Riverside House, New Bailey Salford

PROJECT OVERVIEW

Hannan Associates were part of the team that redeveloped Riverside House at New Bailey, Salford for our client The English Cities Fund.

Riverside House is a four storey, 11,000 sq ft office building, which includes the retention of two sides of the 19th Century facade from the pre-existing building, thought to date back to around the mid 1800’s when it was the Royal Veteran Tavern located behind the site of the Old Bailey Prison.

As part of our duties we provided BREEAM and Building Services Engineering Consultancy for the CAT A installations which expanded to include the CAT B fit out for Muse who now occupy 2 floors of the building

We carried out thermal modelling and system optioneering to conclude the best scheme to meet the Client requirements.

The MEP services strategy was based on chilled beams providing comfort cooling, which helps limit the maintenance requirements within the space and offers the tenants high comfort levels, good space acoustics & low annual running costs. Detailed co-ordination of the exposed services achieved a more visually appealing, quality finish, which helps meet higher end market requirements. The design also included roof mounted photovoltaic arrays, which provides the building with a source of renewable energy.

The retention of the Victorian Gothic style facade gives the building a real sense of place and history and helps to create a gateway to New Bailey. Utilising the floor void for ventilation helped to maintain floor levels which suited the existing façade.

The project won ‘Fit Out of Workplace’ at the 2020 BCO Awards, ‘Design in Excellence’ at the 2020 Insider Property North West Awards and ‘Best Development Outside London Under 35,000 sq ft’ at the 2022 OAS Development Awards.

Riverside House Transformation Complete

 

About This Project

5

CLIENT : The English Cities Fund

5

ARCHITECT: Alford Hall Monaghan Morris

5

CONTRACT DURATION: 2018 - 2019

Get in touch

15 + 10 =

Stoke City Bet 365 Stadium Expansion 7 Refurb

Stoke City Bet 365 Stadium Expansion 7 Refurb

Stoke City Bet 365 Stadium Expansion & Refurb

PROJECT OVERVIEW

Hannans have been providing Building Services Engineering consultancy for Stoke City Football Club over the last nine years for the Bet 365 Stadium and the club’s training ground at Clayton Wood.

Works have included:

Bet 365 Stadium

o Infill of the South East Corner Stand creating additional seating and concourse including diversions and maintaining existing services

o Upgrade of the stadium accessible seating in all stands to comply with Premier league and government guidance

o SE and NW Corner media screens and new NW corner media control suite including diversions

o Alteration of the South stand segregation for away fans to allow flexibility of use

o Refurbishment of the Boardroom, Chairman’s Suite, the Players’ Lounge, Ricardo’s Bar, Concourse washrooms

o Installation of new LED floodlighting and Fire Alarm System

Clayton Wood Training Ground

o Construction and building extension for a Parents’ Hub

o Plans for the addition of new Show Pitch and sub soil heating

o Refurbishment of the first team building

About This Project

5

CLIENT : Stoke City FC + Bet 365

5

ARCHITECT : AFL Architects

5

CONTRACT DURATION: 2016 - ongoing

Get in touch

15 + 3 =

Harrier Park, Hucknall

Harrier Park, Hucknall

Harrier Park, Hucknall

PROJECT OVERVIEW

The national headquarters for RM Resources at Harrier Park, Hucknall was completed in 2020.

RM resources, part of RM plc, are a market leading provider of technology and resources to the education sector.  Their new 195,840 sq ft headquarters will help to consolidate their distribution activities into a single location and forms part of a wider improvement programme across their business.

Hannan Associates are very pleased to have provided Building Services Engineering, Utilities Infrastructure and BREEAM assessment for the project working alongside The Harris Partnership, WSP, Re-Form Landscape Architects, RPP and main contractor GMI.

The building achieved a BREEAM Very Good rating under the BREEAM New Construction 2018 scheme.

Harrier Park is a 67 acre mixed-use development at Hucknall, led by an exciting joint venture between Muse and the site-owner Rolls-Royce. The development will bring forward commercial space, industrial units, new homes, a primary school and community facilities, which will create a number of jobs in the area.

About This Project

5

CLIENT : Muse

5

PROJECT VALUE : £8.8M

5

CONTRACT DURATION: 2019 - 2020

Get in touch

1 + 5 =

ABC Cinema, Lime Street, Liverpool

ABC Cinema, Lime Street, Liverpool

ABC Cinema, Lime Street, Liverpool

PROJECT OVERVIEW

The ABC Cinema building occupies a prominent near Lime Street station close to the cultural quarter in Liverpool City centre.

The building condition has been subject to decay and vandalism during its period of disuse.

Our work on the project has been to provide MEP support to the feasibility studies aimed at returning the building to use as a performance and leisure has location.

Our support has included condition appraisal and the examination of the MEP options for returning the building to operation. Our advice has included the engineering of the plant spaces required and cost advice associated with the services installations.

The current study involves the conversion to a live performance facility with facilities for professional live recording for pay per view Internet streaming.

The proposals also include food and bar offerings for those attending the live shows.

About This Project

5

CLIENT : Ion Developments

5

ARCHITECT: Austin Smith Lord

5

CONTRACT VALUE: £11 milion

5

CONTRACT DURATION: April 2014 - ongoing

Get in touch

10 + 9 =

Heathrow Airport Holiday Inn, London

Heathrow Airport Holiday Inn, London

Heathrow Airport Holiday Inn, London

PROJECT OVERVIEW

We provided Performance and Monitoring duties for this hotel development at Heathrow Airport. The hotel comprises of 232 bedrooms, 17 meeting rooms and leisure and restaurant facilities.

About This Project

5

CLIENT : Alfred McAlpine special Projects & BDL Hotels

5

PROJECT VALUE : £12 million

5

CONTRACT DURATION: Jan 1999 - June 2001

Get in touch

3 + 6 =

Pin It on Pinterest