MUFC Training Ground, Carrington

MUFC Training Ground, Carrington

MUFC Training Ground, Carrington

PROJECT OVERVIEW

Having successfully previously completed the academy building and full size indoor pitch at Manchester United’s Carrington training complex, Hannans were appointed to design the building services and infrastructure diversions for a series of alterations, extensions and new buildings.

The scheme comprises the refurbishment alteration and extension of the first team building, a new sponsors building, a new parents and spectators building, relocation and additions to the a side courts, new car parking surfacing, temporary accommodation and lighting and a new feature linking glazed walkway and water feature with illuminated signage with a scheme value of around £13m.

The works included an enabling diversions and drainage improvements package and working on a live site environment with the first team, academy teams and team management remaining on site during the works. This required careful planning and phasing of the works to protect all staff but particularly the valuable players and management team while maintaining privacy and completing the project in a short timescale.

About This Project

5

CLIENT : Manchester United Football Club

5

ARCHITECT : Marshall Kypriadis Architects

5

PROJECT VALUE : £160 million

5

CONTRACT DURATION: March 2010 – January 2014

Get in touch

8 + 3 =

The Clayworks, Smithfield Stoke

The Clayworks, Smithfield Stoke

The Clayworks, Stoke Smithfield PRS Scheme

PROJECT OVERVIEW

The Clayworks is a build to rent residential apartment scheme developed by Genr8 Developments in partnership with Stoke City Council as part of the wider £170M redevelopment of the heart of Stoke-on-Trent.

The Hannan residential team provided Stage 3 Building Services Design and specification together with construction supervision duties for the 11-storey apartment block, which provides 151 build to rent one and two bed apartments, providing much needed living space in a central location.

The residential development, which is now half let, also features co-working space, function rooms, cycle storage and a roof top terrace with BBQ facilities.

The name Clayworks is a nod to the city’s history of potteries production for centuries.

The overall masterplan will provide the crucial link between existing residential, shopping, cultural and heritage areas helping to bring the city together more coherently.

We worked alongside Cartwright Pickard Architects, Planit IE and Buro Happold on the design team and Willmott Dixon has been appointed as the main contractor.

 

The Smithfield Scheme Transforming the Future of Stoke

 

About This Project

5

CLIENT : Genr8 Developments

5

ARCHITECT : Cartwright Pickard Architects

5

PROJECT VALUE : £170 million

5

CONTRACT DURATION: October 2015 - October 2020

Get in touch

7 + 8 =

Carpino Place, Salford

Carpino Place, Salford

Carpino Place, Salford

PROJECT OVERVIEW

Carpino Place is one of the latest phases of residential development to be delivered on Chapel Street, Salford by the English Cities Fund as part of the wider Salford Central regeneration scheme. This new development of townhouses follows in the footsteps of the award winning Vimto Gardens and Timekeepers Square.

The scheme comprises 22 three-storey townhouses with an internal courtyard housing car parking spaces for each home, private rear gardens, rooftop terraces and patio areas.

We were pleased to work alongside Buttress Architects, Integra Consulting, Appleyard & Trew and John Turner Construction on the project. Our services included early stage concept design and co-ordination with the design team and the review of renewable energy technologies for the scheme.

As part of our duties we also obtained budget utility costs and produced a specification and drawings for the MEP services. We carried out Part L1A calculations and predicted EPC results for each property type, as well as undertaking an overheating analysis. We carried out site visits to review the MEP installations and produced detailed site inspection snagging and defects reports to maintain the highest level of quality throughout.

The English Cities Fund worked in conjunction with Salford City Council to develop the project, creating a design that complements the surrounding area, as well as enhancing the existing streetscape, and strengthening its urban setting. After completion the regeneration of the Salford Central area will create around 11,000 new jobs, 220,000 sq m of commercial space, 849 new homes and 390 hotel rooms.

About This Project

5

CLIENT : Muse / English Cities Fund

5

ARCHITECT : Buttress Architects

5

PROJECT VALUE : £3.5 million

5

CONTRACT DURATION: 2015 - 2018

Get in touch

15 + 12 =

Rochdale Riverside

Rochdale Riverside

Rochdale Riverside

 

PROJECT OVERVIEW

We are part of the team working to deliver Rochdale Riverside, one of several projects undertaken as part of Rochdale Council’s town centre masterplan. The scheme is part of a joint venture between Genr8 Developments and Kajima, in collaboration with Rochdale Development Agency and Rochdale council. The main contractor for the development is Willmott Dixon.

Completed in April 2020, the first phase of Rochdale Riverside includes a new 200,000 sq ft retail and leisure quarter where occupiers include Marks and Spencer,  H&M, JD Sorts, River Island, Next, New Look and Boots. The retail complex also features a six-screen Reel Cinema and Hollywood Bowl Puttstars. Submitted plans for phase 2 include two apartment blocks of nine storeys, a 147-bedroom hotel and 43,000 sq ft of offices.

Our engineers are providing building services engineering consultancy for the base build shell, core elements and landlord’s areas, including thermal modelling and Part L analysis for each of the buildings. We are also providing BREEAM Assessment duties for the project.

Hannan Associates have worked closely with other members of the design team to develop innovative, landmark buildings, with effective and efficient building services solutions to meet the needs for each particular building.
Due to the nature of the development and location of the site, our role has also involved extensive dialogue and negotiations with all utility providers in the area, to deal with the extensive major utility diversions that will be necessary on and around the site, as well as dealing with the new supply connection requirements.

Hannan Associates are extremely proud and excited to be working with Genr8 and the rest of the team on this project which is transforming Rochdale’s retail and commercial landscape and giving its residents a town centre they can be proud of.

Rochdale Riverside Update

Regenerating Rochdale

Progress Rochdale Riverside

About This Project

5

CLIENT : Genr8 Developments & Arcadis

5

ARCHITECT : T P Bennett Partnership

5

PROJECT VALUE : £50 million

5

CONTRACT DURATION: October 2014 – Ongoing

Get in touch

3 + 8 =

No.2 New Bailey, Salford

No.2 New Bailey, Salford

No.2 New Bailey, Salford

PROJECT OVERVIEW

No. 2 New Bailey is the second new office building at Salford Central’s New Bailey development. This 188,500 sq ft office building is the first scheme designed by architects Alford Hall Monaghan Morris in Greater Manchester.

The 11-storey building includes CAT A open plan office across 10 floors, commercial unit space at ground floor, basement car parking, external roof terrace and a public square and is on target to achieve an A rated Energy Performance Certificate, a BREEAM Excellent rating along with a Wired Score rating of Platinum.

Hannan Associates provided Building Services Engineering Consultancy and BREEAM Assessment for the development.

Each floor is designed to be sub-divided into two separate tenancies, each area provided with a private external balcony. Simultaneous Variable Refrigerant Flow heating & cooling systems are provided to each tenancy, mechanical fresh air ventilation from roof mounted air handling plant incorporating heat recovery, which offers good flexibility and is easily adaptable to cope with sub-division and high occupant density.

The client’s design aspirations included exposed services with acoustic rafts to conceal the indoor VRF units and improve the acoustics of the open plan office space.

Eversheds Sutherland are taking approximately 50,000 sq ft across the part 8th, 9th and 10th floors with BLM LLP signed to occupy first to fourth floors .

The project is being backed by the English Cities Fund (tECF) – a joint venture between Muse, Legal and General and Homes England.

About This Project

5

CLIENT : Muse & English Cities Fund

5

ARCHITECT : Allford Hall Monaghan Morris

5

PROJECT VALUE : £35 million

5

CONTRACT DURATION: 2016 – 2020

Get in touch

5 + 7 =

Pin It on Pinterest