DWP Hub, Talbot Gateway Blackpool

DWP Hub, Talbot Gateway Blackpool

DWP Hub, Talbot Gateway Blackpool

PROJECT OVERVIEW

Plans for this new 215,000 sq ft, £100m office development will form part of the third phase of the Talbot Gateway regeneration scheme in Blackpool, led by Muse Developments.

When complete the seven storey office building will become home to over 3000 staff from the Department of Work and Pensions.

Hannan Associates are providing Building Services Engineering Consultancy including Net Zero Carbon operational energy modelling and BREEAM assessor duties for the development.

The building has been designed to be ultra-low energy. Low-carbon heating and cooling to the office will be provided via air source heat pumps. Demand-driven ventilation will also be provided, helping improve indoor air quality while saving energy during periods of reduced occupancy.

The building has been designed to achieve a BREEAM ‘Excellent’ rating.

We are working alongside Make Architects, RPS, Chroma, Arup on Muse Development’s design team.

The Talbot Gateway regeneration is transforming Blackpool town centre and will comprise of a new business district and civic quarter, grade A offices, retail space, event space and a new public transport interchange.

About This Project

5

CLIENT : Muse Developments

5

ARCHITECT : Make Architects

5

CONTRACT DURATION: November 2020 - ongoing

Get in touch

15 + 6 =

Ralli Quays, Salford

Ralli Quays, Salford

Ralli Quays, Salford

PROJECT OVERVIEW

Hannan Associates are part of Legal & General Investment Management’s team for the design of the Ralli Quays office and hotel scheme on the River Irwell in Salford.  

The client is targeting net zero carbon via a combination of the UKGBC 2030 targets and carbon offset for both construction and operation, including a high NABERS Star Energy Rating.

The building is also targeting BREEAM excellent and EPC A.

Our role on the project includes Sustainability Services, BREEAM and MEP Design.

Ralli Quays is one of only fourteen developments in the UK pioneering the Better Buildings Partnership Design for Performance initiative.  The key objective of the Pilot Programme was to provide a strong evidence base for proceeding to a fully-fledged DfP Scheme.

As part of our package we are utilising complex thermal modelling software to accurately simulate HVAC plant and control networks for each building in order to ascertain the predicted in use operational energy consumptions for a variety of on-axis and off-axis scenarios. This is vital in providing a building-integrated approach where the HVAC systems and building are assessed as a whole all gains/losses, heat transfer and thermal mass in the building to be accounted for alongside system performance.

This allows us to address the performance gap that has been created by the out of date methodology to design buildings for compliance, as we can accurately assess the results of simulations and check against the latest Energy Performance Targets based on the Australian NABERS approach.

We are very pleased to join EPR Architects, DPP One, Turner & Townsend, Walker Sime, Clancy Consulting, Colliers on the project design team.

About This Project

5

CLIENT : Legal & General

5

ARCHITECT : EPR Architects

5

CONTRACT DURATION: October 2018 - ongoing

Get in touch

6 + 6 =

Patagonia Place, Liverpool Waters

Patagonia Place, Liverpool Waters

Patagonia Place, Liverpool

PROJECT OVERVIEW

Hannan Associates are very pleased to be part of the team delivering Patagonia Place – an iconic residential development planned for Princes Dock on the Liverpool waterfront.

The 31 storey residential tower forms the next major residential development at Liverpool Waters and is being developed by Peel Land & Property Group and Your Housing Group.

Hannan Associates are providing MEP client monitoring Services on behalf of Peel during Stages 2 to 6 and our role includes technical liaison with Your Housing Group and Vermont representatives throughout the design and construction of this exciting project.

We are very pleased to be working alongside Turner & Townsend, Falconer Chester Hall, WSP, RPS and main contractor Vermont Construction on this project.

Liverpool Waters involves the transformation of the city’s central and northern docks, regenerating a 60-hectare site to create a world-class, mixed use development on Liverpool’s waterfront. When complete the development will provide the city with much needed job opportunities and will strengthen the connection between the waterfront and the city centre.

The Hannan team is also currently providing strategic, procurement and cost advice for the utilities infrastructure required to support and enable the whole of the Liverpool Waters development.

About This Project

5

CLIENT : Peel L&P and Your Housing Group

5

ARCHITECT : Falconer Chester Hall

5

CONTRACT DURATION: June 2020 - ongoing

Get in touch

2 + 15 =

Savoy Cinema, Doncaster

Savoy Cinema, Doncaster

Savoy Cinema, Doncaster

PROJECT OVERVIEW

Hannan Associates are very pleased to have been part of the team involved in the development of a new six-screen Savoy cinema and restaurant in Doncaster’s Civic & Cultural quarter.

This £8.5m project led by Doncaster Council is part of the Urban Centre Masterplan helping to revitalise the Waterdale area of Doncaster town centre.

Our team provided Building Services Engineering and BREEAM assessment for the project and were very pleased to join The Harris Partnership, Rex Procter & Partners, JPG Group and main contractor the Lindum Group on the project team.

Visitors to the new cinema will experience luxury recliner and rocker seating, Vertex viewing with next-generation 4K laser projection and Dolby Atmos immersive sound.

The project benefited from £635,000 in funding from the Sheffield City Region Local Growth Fund and is one of many projects contributing towards the wider regeneration of Doncaster and it is hoped that this new facility will create over 100 jobs

About This Project

5

CLIENT : Doncaster Council

5

ARCHITECT : The Harris Partnership

5

PROJECT VALUE : £8.5 million

5

CONTRACT DURATION: September 2018 - November 2020

Get in touch

2 + 12 =

Harrier Park, Hucknall

Harrier Park, Hucknall

Harrier Park, Hucknall

PROJECT OVERVIEW

The new national headquarters for RM Resources at Harrier Park, Hucknall has reached completion.

RM resources, part of RM plc, are a market leading provider of technology and resources to the education sector.  Their new 195,840 sq ft headquarters will help to consolidate their distribution activities into a single location and forms part of a wider improvement programme across their business.

Hannan Associates are very pleased to have provided Building Services Engineering, Utilities Infrastructure and BREEAM assessment for the project working alongside The Harris Partnership, WSP, Re-Form Landscape Architects, RPP and main contractor GMI.

The building achieved a BREEAM Very Good rating under the BREEAM New Construction 2018 scheme.

Harrier Park is a 67 acre mixed-use development at Hucknall, led by an exciting joint venture between Muse Developments and the site-owner Rolls-Royce. The development will bring forward commercial space, industrial units, new homes, a primary school and community facilities, which will create a number of jobs in the area.

About This Project

5

CLIENT : Muse Developments

5

PROJECT VALUE : £8.8 million

5

CONTRACT DURATION: April 2019 - November 2020

Get in touch

6 + 13 =

Pin It on Pinterest