Phase 1A, Ma6nitude Middlewich

Phase 1A, Ma6nitude Middlewich

Phase 1A, Ma6nitude Middlewich

PROJECT OVERVIEW

Phase 1A is the latest development proposed for Tritax Symmetry’s Ma6nitude Middlewich.

Plans for this new logistics scheme include two units of 149,000 sq ft and 41,000 sq ft.

We are very pleased to be providing building services engineering consultancy for the project. Other members of the design team include AEW Architects, RPS and SGI Consulting.

MA6NITUDE is one of the North West’s largest manufacturing and logistics parks and is based in Middlewich close to junction 18 of the M6 motorway.

The park is already home to B&M Retail, Wincanton and Kuehne + Nagel and there is capacity to deliver a further 2.2m sq ft of new manufacturing and logistics space.

About This Project

5

CLIENT : Tritax Symmetry

5

ARCHITECT : AEW Architects

5

CONTRACT DURATION : December 2020 - ongoing

Get in touch

4 + 5 =

Ralli Quays, Salford

Ralli Quays, Salford

Ralli Quays, Salford

PROJECT OVERVIEW

Hannan Associates are part of Legal & General Investment Management’s team for the design of the Ralli Quays office and hotel scheme on the River Irwell in Salford.  

The client is targeting net zero carbon via a combination of the UKGBC 2030 targets and carbon offset for both construction and operation, including a high NABERS Star Energy Rating.

The building is also targeting BREEAM excellent and EPC A.

Our role on the project includes Sustainability Services, BREEAM and MEP Design.

Ralli Quays is one of only fourteen developments in the UK pioneering the Better Buildings Partnership Design for Performance initiative.  The key objective of the Pilot Programme was to provide a strong evidence base for proceeding to a fully-fledged DfP Scheme.

As part of our package we are utilising complex thermal modelling software to accurately simulate HVAC plant and control networks for each building in order to ascertain the predicted in use operational energy consumptions for a variety of on-axis and off-axis scenarios. This is vital in providing a building-integrated approach where the HVAC systems and building are assessed as a whole all gains/losses, heat transfer and thermal mass in the building to be accounted for alongside system performance.

This allows us to address the performance gap that has been created by the out of date methodology to design buildings for compliance, as we can accurately assess the results of simulations and check against the latest Energy Performance Targets based on the Australian NABERS approach.

We are very pleased to join EPR Architects, DPP One, Turner & Townsend, Walker Sime, Clancy Consulting, Colliers on the project design team.

About This Project

5

CLIENT : Legal & General

5

ARCHITECT : EPR Architects

5

CONTRACT DURATION: October 2018 - ongoing

Get in touch

10 + 7 =

Patagonia Place, Liverpool Waters

Patagonia Place, Liverpool Waters

Patagonia Place, Liverpool

PROJECT OVERVIEW

Hannan Associates are very pleased to be part of the team delivering Patagonia Place – an iconic residential development planned for Princes Dock on the Liverpool waterfront.

The 31 storey residential tower forms the next major residential development at Liverpool Waters and is being developed by Peel Land & Property Group and Your Housing Group.

Hannan Associates are providing MEP client monitoring Services on behalf of Peel during Stages 2 to 6 and our role includes technical liaison with Your Housing Group and Vermont representatives throughout the design and construction of this exciting project.

We are very pleased to be working alongside Turner & Townsend, Falconer Chester Hall, WSP, RPS and main contractor Vermont Construction on this project.

Liverpool Waters involves the transformation of the city’s central and northern docks, regenerating a 60-hectare site to create a world-class, mixed use development on Liverpool’s waterfront. When complete the development will provide the city with much needed job opportunities and will strengthen the connection between the waterfront and the city centre.

The Hannan team is also currently providing strategic, procurement and cost advice for the utilities infrastructure required to support and enable the whole of the Liverpool Waters development.

About This Project

5

CLIENT : Peel L&P and Your Housing Group

5

ARCHITECT : Falconer Chester Hall

5

CONTRACT DURATION: June 2020 - ongoing

Get in touch

1 + 10 =

Mountpark Warrington Omega II

Mountpark Warrington Omega II

Mountpark Warrington Omega II

PROJECT OVERVIEW

Mountpark Warrington Omega phase II is the latest development at Omega South distribution park.

This state-of-the-art logistics development funded by Mountpark Logistics comprises three units of 307,807 sq ft, 225,312 sq ft and 203,180 sq ft.

Each unit will include a rooftop solar PV array and battery storage that will meet about 50 per cent of the facility’s incoming supply capacity.

Hannans are providing Building Services Engineering design and monitoring, utilities infrastructure consultancy and BREEAM pre- assessment. The scheme is targeting BREEAM Excellent.

We are pleased to join Chetwood Architects, Doig & Smith, WSP and Projex Solutions on the project design team, and the principal contractor McLaren Construction.

About This Project

5

CLIENT: Mountpark

5

ARCHITECT: Chetwood Architects

5

CONTRACT DURATION: July 2019 - ongoing

Get in touch

2 + 14 =

Valette Square, Salford

Valette Square, Salford

Valette Square, Salford

PROJECT OVERVIEW

Hannan Associates were part of the team to design and deliver the recently completed Valette Square, developed by The English Cities Fund – a joint venture between Homes England, Legal & General and Muse Developments.

The development includes 33 townhouses with a mix of 2, 3 and 4 bedrooms with private gardens and terraces. It is situated just off Chapel Street, a short walk to Manchester City Centre, Spinningfields, New Bailey, Peel Park and the River Irwell.

Hannan Associates provided Building Services Engineering consultancy for the new homes, including early stage MEP concept design, utility connections & diversions advice, initial Part L1A calculations, renewable energy technologies feasibility review and site inspection duties.

The design of the townhouses’ façade and orientation optimises natural daylighting and reduces the requirement of artificial lighting. Other design features include smart utility metering, occupant controlled zoned heating system, low energy light fittings, improved insulation to minimize heat loss & reduce utility bills and Integrated Virgin Media and BT telecoms infrastructure.

Other members of the team included Buttress Architects, Integra Consulting, Chroma and main contractor John Turner Construction Group. 

This is the fourth phase of residential development in the Chapel Street area by the English Cities Fund, which forms part of the wider Salford Central masterplan.  Other schemes include Vimto Gardens, Timekeepers Square and Carpino Place .

The development is named after French Impressionist painter Pierre Adolphe Valette known for his acclaimed paintings of Manchester and Salford. He was a teacher at the Manchester Municipal School of Art and is remembered as L. S. Lowry’s tutor.

About This Project

5

CLIENT : The English Cities Fund

5

ARCHITECT : Buttress Architects

5

CONTRACT DURATION: May 2018 - January 2021