St Monica’s Hoxton, London

St Monica’s Hoxton, London

St Monica’s Hoxton, London

PROJECT OVERVIEW

Mixed development refurbishment, creating office, restaurant, residential and community space.

Adapted between 2001 and 2004, the work focused on three areas. The first, a ground floor rear extension, which replaces the old playground and houses the gym. The rear wall adjoining the Arden Estate and roof have been treated as one continuous timber surface. A range of timber shutters in the wall and flush but operable skylights naturally ventilate the Douglas fir ply-lined interior. The second extension, similar to that in the playground, is a single-storey star-shaped structure with a glazed elevation that reflects the surrounding roofscape. This houses an apartment. Lastly, inside each original whitewashed brick-lined classroom, the design introduced stressed-ply timber-clad mezzanines. 

The original entrances were reconfigured to accommodate the many different organisations and individuals that share the building. A sequence of four hallways step deep into the plan, leading ultimately to the new lift. The third is a red timber panelled room overlooking a new and strangely shaped garden lined in green mirror glass that accentuates the green hue of the ferns filling the space.

About This Project

5

CLIENT : Capital and Provident

5

ARCHITECT : Buschow Henley

5

CONTRACT DURATION: 2001 - 2004

Get in touch

2 + 2 =

Ronald McDonald House Oxford

Ronald McDonald House Oxford

Ronald McDonald House Oxford

PROJECT OVERVIEW

We are very pleased to have been part of the team for the design and delivery of this new 62 bedroom Ronald McDonald House in Oxford.

Hannans provided Building Services Engineering services, undertaking the detailed design of the MEP services throughout the house. Construction commenced in February 2019 and the new facility opened in May 2020.

This Ronald McDonald House provides free ‘home away from home’ accommodation for families whose children are undergoing treatment at Oxford Children’s Hospital, as well as Children’s Critical Care and the Neonatal Intensive Care Unit (NICU) on the John Radcliffe Hospital site.

We worked alongside AEW Architects, Ridge and Partners and Capita on the project design team.
The principal contractor for the project was Wilmott Dixon Construction.

 

 

ABOUT THIS PROJECT

5

CLIENT : Ronald McDonald House Charities

5

ARCHITECT : AEW Architects

5

CONTRACT VALUE: £14 million

5

CONTRACT DURATION : 2017 - 2020

Get in touch

8 + 14 =

Ronald McDonald House Manchester

Ronald McDonald House Manchester

Ronald McDonald House Manchester

PROJECT OVERVIEW

Hannans were very pleased to be part of the team who donated their services for the design and construction of the new Steve Burn Rooms at Ronald McDonald House in Manchester.

Three spaces within the existing Manchester house have been refurbished to create five new six person family bedrooms along with an external reflection area via fund raising driven by Steve Burne.

The additional bedrooms will provide over 1,000 additional nights home from home accommodation for families with children in Royal Manchester Children’s Hospital.

The Ronald McDonald House Charity helps families to stay close to their child in hospital while they undergo medical treatment by giving them a warm and welcoming environment where they can stay for as long as they need. To find out more about the charity please visit their website: https://www.rmhc.org.uk/

 

Ronald McDonald House Charity

Steve Burne Rooms Open

ABOUT THIS PROJECT

5

CLIENT : Ronald McDonald House Charities

5

ARCHITECT : AEW Architects

5

CONTRACT DURATION : 2017 - 2018

Get in touch

8 + 14 =

The Slate Yard, New Bailey, Salford

The Slate Yard, New Bailey, Salford

The Slate Yard, New Bailey, Salford

PROJECT OVERVIEW

The Slate Yard is a Build to Rent Apartment scheme overlooking the River Irwell at New Bailey, Salford, which comprises three blocks of one, two and three bed apartments with communal facilities:

  • Plot A5 – A £13M, 10 storey apartment block incorporating 90 Apartments
  • Plot A6 – A £17M, 16 storey apartment block incorporating 135 Apartments
  • Plot A7 – A £30M, 21 storey apartment block incorporating 199 Apartments

Hannan Associate’s role was to produce stage 3 developed design information for the building services engineering strategy and then monitor the design and workmanship on site.

The design of the building and the services strategy utilises energy efficient features throughout to minimise its carbon and environmental footprint and meet the sustainable standards set out in the Part L Building Regulations.

With the help of advanced building modelling we incorporated the most effective passive construction techniques in the design of the building, including:

  • Enhanced insulation to limit heat loss
  • An engineered façade design, which maximises the use of natural daylight & passive solar gains but minimises thermal losses and overheating
  • Reduced building air permeability, which minimises heat loss & the related energy usage and CO2 emissions.

The Incorporation of high efficiency systems and effective controls throughout the design helped to further minimise energy usage. These features include: smart heating controls, heat recovery ventilation systems, energy efficient lighting and energy efficient lifts.

PVs were integrated into the building design to meet a proportion of the electrical demand or to be fed back to the grid when demand is low.

New Bailey is part of The English Cities Fund’s £650 million regeneration scheme transforming the area of Salford Central.  The over 50-acre masterplan contains commercial, retail and residential buildings creating a new and vibrant destination for people to live, work and relax.

Final Phase of Slate Yard Reaches 21 Storeys

 

About This Project

5

CLIENT : English Cities Fund

5

ARCHITECT : AHR

5

PROJECT VALUE : Various

5

CONTRACT DURATION: 2014 - 2020

Get in touch

9 + 15 =

Gorton Foundry, Hammertone Road

Gorton Foundry, Hammertone Road

Gorton Foundry, Hammerstone Road

PROJECT OVERVIEW

Hannan Associates were pleased to be part of Morgan Sindall Construction’s team delivering the refurbishment of Manchester City Council’s waste disposal and maintenance depot on Hammerstone Road in Gorton, Manchester.

The project has transformed the historic former locomotive shed at the old Gorton Foundry site into a modern, sustainable operational hub, bringing together a range of Council services alongside Biffa’s waste management and refuse vehicle operations.

Originally occupied by railway manufacturers Beyer, Peacock & Co between 1854 and 1966, the building has significant industrial heritage. The refurbishment has preserved much of the existing structure while adapting the facility to meet the needs of modern council operations.

Hannan Associates provided Building Services Design, Building Physics Design and Sustainability Consultancy Services on behalf of Morgan Sindall, alongside a future design and installation monitoring role.

A key objective of the project was to improve the building’s energy performance and reduce carbon emissions in line with Manchester City Council’s wider sustainability ambitions.

Dynamic thermal simulation was used to inform a fabric-first approach to carbon reduction, helping to improve the building’s thermal performance and energy efficiency.

Renewable energy generation was incorporated through the installation of 2,000 rooftop photovoltaic panels, helping to reduce operational carbon emissions and energy costs.

The development also includes a rainwater harvesting system to supply the vehicle wash facilities, alongside electric vehicle charging infrastructure to support the transition towards lower-emission refuse collection vehicles.

The refurbishment has also delivered upgraded building services, modern office accommodation and improved maintenance facilities, creating a flexible, multi-tenant environment that supports the Council’s operational requirements while extending the life of this historic building.

Following the completion of Phase Three in 2025, the project represents an important example of how sensitive refurbishment, building services engineering and sustainable design can work together to preserve Manchester’s industrial heritage while delivering a modern, energy-efficient facility. We are delighted to have worked alongside Morgan Sindall Construction, Manchester City Council, Fletcher Rae Architects and Curtins on this project. 

 

About This Project

5

CLIENT : Morgan Sindall & Manchester city Council

5

ARCHITECT : Flecher Rae Architects

5

PROJECT VALUE : £12.2 million

5

CONTRACT DURATION: 2018 – 2024