Peaks and Plains HQ, Macclesfield

Peaks and Plains HQ, Macclesfield

Peaks & Plains HQ, Macclesfield

PROJECT OVERVIEW

In the wake of their 10 year anniversary, the head office of Peaks and Plains Housing Trust underwent a transformational fit out programme.

The award wining project, designed by BAND Architects, involved the refurbishment of  the trust’s Ropewalks building to reflect the changing needs of their business.

The new layout of the offices reflects the vibrant communities that Peaks & Plains work with across Cheshire, by creating a homely feel whilst bringing together its core operations into a single working environment.

Hannan Associates were appointed as MEP Design consultants on the project alongside BAND Architects, Abacus Cost Management, Brown and Bancroft Interiors, JMC Contractors and Kinnarps Workspace Solutions.

We provided the outline design of the MEP Services and carried out a technical checking role for the client, reviewing both the detailed design of the Contractor and also the site installation works.

Our team ensured that our client’s interests were protected and their objectives realised by ensuring that the full operational requirements & functionality of the office was understood at an early stage and all elements were included within the tender package submitted. Our team remained open minded  and focussed on helping to create a better office environment for the trust’s staff.

We subsequently worked with the contractors to oversee any value engineering proposals to ensure that the project was delivered to budget but at the same time only high quality alternatives were accepted to complete the project in line with the overall vision the client was hoping to achieve.

About This Project

5

CLIENT : Peaks & Plains Housing Association

5

ARCHITECT : Band Architects

5

PROJECT VALUE : £800,000

5

CONTRACT DURATION: 2016 - 2017

Get in touch

10 + 9 =

Bristol Sport Ashton Gate Stadium

Bristol Sport Ashton Gate Stadium

Bristol Sport Ashton Gate Stadium

PROJECT OVERVIEW

We were appointed by Bristol Sport together with Capita Project Management and KKA Architects for the scheme to complete the redevelopment of the Ashton Gate Stadium.

The redevelopment involves the replacement of the South Stand, West Stand and the refurbishment of the existing East Stand increasing seating capacity to circa 26,500 seats. Construction for the development has been phased to allow continued usage of the stadium for football and rugby events during the construction. The stadium is designed as a flexible use for non-event day use including exhibitions and conferences and the concourses have enhanced finishes with LED lighting and signage internally and externally.

The planning conditions included a requirement for renewable energy production and the scheme includes bio diesel heating and a large photovoltaic array on the West stand roof.

We were appointed to provide MEP Design, Acoustics, IT, Sports Lighting & Fire Engineering Consultancy and BREEAM Assessment for the project.

About This Project

5

CLIENT : Bristol Sport

5

ARCHITECT : KKA

5

PROJECT VALUE : £40 million

5

CONTRACT DURATION: April 2013 –2016

Get in touch

11 + 12 =

MUFC Old Trafford Museum, Manchester

MUFC Old Trafford Museum, Manchester

MUFC Old Trafford Museum, Manchester

PROJECT OVERVIEW

One of several projects we have undertaken for MUFC during the last 25 years is the Old Trafford Museum that includes a visitor centre and the red café. We designed the complete mechanical, electrical and public health installations. The project involved the fitting out of the existing level 3 of the North Stand. Themed areas include the theatre, Red café and interactive exhibit spaces.

Designing the mechanical and electrical services for the building was a challenge due to the unique construction of the stadium and stringent requirements for public safety on Match and non-match days. Interfacing with existing systems was a major consideration during the design and installation. Existing systems had to be extended and/or modified so that they were coordinated with the exhibition stands and displays. All works were undertaken whilst the stand was occupied.

The museum won large visitor attraction of the year at the 2013 Manchester Tourism Awards, it has also been awarded an Enjoy England Quality Attraction Rose. It has achieved a Gold Green Tourism Status due to outstanding contributions to green tourism, including the use of latest technologies such as LED lighting, efficient boilers and renewable technologies.

Awards
2013 Manchester tourism Awards – large visitor attraction of the year
Enjoy England – Quality attraction rose
Green Tourism – Gold Award

About This Project

5

CLIENT : Manchester United Football Club

5

ARCHITECT : AFL

5

PROJECT VALUE : £4 million

Get in touch

2 + 2 =

Amazon, Logic Leeds Business Park

Amazon, Logic Leeds Business Park

Amazon, Logic Leeds Business Park

PROJECT OVERVIEW

We provided utilities infrastructure master planning and procurement for the overall development proposals and design and monitoring services for the MEP associated with the initial speculative 80,000 ft² industrial unit. As part of the team we contributed to the specification of the unit which was developed to provide a wide tenant appeal and a high level of flexibility to attract potential tenants.

The unit is now let to Amazon and we assisted the client during the letting of the unit and carried out the design and monitoring of additional car parking facilities requesting by Amazon.

Logic Leeds is part of the Leeds Enterprise Zone, which means that it benefits from a range of incentives for occupiers. Overall there is outline planning for 1.6 million ft² of quality industrial, storage and distribution development. All buildings will have a high BREEAM rating and state-of-the-art facilities.

About This Project

5

CLIENT : Muse

5

ARCHITECT : Fletcher Rae Architects

5

PROJECT VALUE : £5 million

5

CONTRACT DURATION: 2014 – 2016

Get in touch

6 + 11 =

John Lewis, Logic Leeds Business Park

John Lewis, Logic Leeds Business Park

John Lewis, Logic Leeds Business Park

PROJECT OVERVIEW

The building was constructed to meet the pre let requirements of John Lewis for a new 50,000 ft² customer delivery distribution hub. The building design and handover information was carried out using BIM protocols in accordance with John Lewis requirements.

Our role involved assisting the client with tenant liaison and the development of the brief with the John Lewis team. We were responsible for the infrastructure procurement and the provision of a Stage 3+ design and performance specification for the MEP systems. We monitored the contractor design stages and construction of the works through to handover to ensure compliance with the strict tenant requirements

Logic Leeds Business Park consists of a 100 acre manufacturing & distribution park located within the Aire Valley Enterprise Zone. The business park provides high quality industrial & warehouse units, in a fully landscaped environment, with immediate connectivity to the M1 motorway.

We are very proud to have been involved with the development of the entire Business Park as well as providing Tenant Liaison duties where required.

About This Project

5

CLIENT : Muse

5

ARCHITECT : Fletcher Rae Architects

5

PROJECT VALUE : £6.2 million

5

CONTRACT DURATION: 2015 – 2016

Get in touch

10 + 7 =