Matalan Headquarter Offices, Knowsley

Matalan Headquarter Offices, Knowsley

Matalan Headquarter Offices, Knowsley

PROJECT OVERVIEW

Our client Maro Developments won Regeneration Partnership of the Year at the 2014 Knowsley Business Awards for this Matalan HQ Project at Knowsley Business Park. Hannan Associates were responsible for the MEP Services Design for the project which reached practical completion in December 2014, with the first staff taking occupation in January 2015.

We were part of the design team which was led by Maro Developments and included Fletcher-Rae Architects, Capita Symonds and Curtins Consulting.

The scheme formed part of the regeneration of the former Petrolite site and the Galaxy Distribution Centre, and incorporates the construction of a new 132,000 sq ft, three floor Head Quarter office building and car park for Matalan. The build also included a 100,000 sq ft extension to the neighbouring 500,000 sq ft Galaxy distribution facility.

The services were designed to accept a proposed CHP cogeneration, which provides electricity and district heating. An absorption chiller in the office building have been used to provide cooling. The office development was designed to achieve a BREEAM ‘very good’ environmental rating.

Awards

2014 Knowlsey Business & Regeneration Awards – Regeneration Partnership of the Year

About This Project

5

CLIENT : Maro Developments

5

ARCHITECT : Fletcher Rae

5

PROJECT VALUE : £22 million

5

CONTRACT DURATION: 2012 – 2014

Get in touch

8 + 9 =

Mann Island, Liverpool

Mann Island, Liverpool

Mann Island, Liverpool

PROJECT OVERVIEW

Situated between the ‘Three Graces’ and Albert Dock, Mann Island is a RIBA award-winning mixed-use development which reconnects Liverpool’s city centre to its historic waterfront.

Hannan Associates were responsible for the detail design of the Building Services systems, for the new commercial building within the complex. The building provides 172,000 sq ft of comfort cooled office space over 14 floors. The block is part of a scheme that opens up access to previously enclosed dockland areas, to create three new publics spaces, two fourteen-storey residential buildings, retail, leisure, and exhibition spaces.

Our involvement included the base build Category A works to meet the Development brief and the Category B fit out to meet the requirements of Mersey Travel which includes an exhibition space on the ground floor.

The internal environment is controlled by a highly efficient VRF comfort cooling system, which incorporates renewable energy content. The design achieved BREEAM Excellent rating and won a 2015 RIBA North West Award.

Awards

2015 RIBA North West Award Winner

About This Project

5

CLIENT : Smith Group

5

ARCHITECT : Broadway Malyan

5

PROJECT VALUE : £18 million

5

CONTRACT DURATION: 2009 – 2010

Get in touch

14 + 4 =

Lingley Mere Business Park, Warrington

Lingley Mere Business Park, Warrington

Lingley Mere Business Park, Warrington

PROJECT OVERVIEW

Lingley Mere is an established business park in the North West, which is currently home to over 3,000 office workers and is to be taken forward under a masterplanned development programme to provide 1.25m sq ft of business space and related amenity facilities within an outstanding landscaped environment.

We provided the following services:

 

  • Site wide infrastructure duties
  • Performance duties for 4 no. office buildings comprising of 50,000 sq ft of office accommodation.
  • Detailed design duties for the design of the new ODPM Fire Control Centre
  • Performance duties for the design of a 46,607 sq foot three storey Contact Centre
  • Feasibility studies for the development of a Hotel scheme, Amenity Building and another small office building

    About This Project

    5

    CLIENT : Muse Developments

    5

    ARCHITECT : Leach Rhodes Walker

    5

    PROJECT VALUE : £200 M

    5

    CONTRACT DURATION: 2003 – 2009

    Get in touch

    1 + 15 =

    Eureka Children’s Museum, Halifax

    Eureka Children’s Museum, Halifax

    Eureka Children’s Museum, Halifax

    PROJECT OVERVIEW

    We designed the complete mechanical, electrical and public health installations for this multi-award winning venue that attracts more than 300,000 visitors a year. The project involved refurbishing an old railway station into an open plan themed museum targeting those aged 4 – 16 years.  Themed areas include TV studios, mind & body, and search & rescue areas.

    Designing the mechanical and electrical services for the building was not just about creating a comfortable, practical environment, but also concerned enhancing the visitors’ interactive experience, with the various themed areas and displays.  Our designs were to become an integrated part of the main themes surrounding Eureka. The various interactive displays relied upon the use of relevant services to complement the particular themes. In particular, the lighting schemes that we designed were of great importance to the success and appeal ability of the displays available; encouraging visitors of the museum to look, listen, touch and feel.  Permeable membranes were incorporated in the scheme and coloured for interest.

    Awards

    2009 Yorkshire Tourism Awards – Unique Venue of the Year
    2013 Visit England Awards for Excellence – Bronze
    2013 White Rose Award – Shortlist Large Visitor Attraction of the Year
    2014 Visit England Awards for Excellence – Silver
    2015 Visit England Awards for Excellence – Gold
    2016 Charity Awards – Arts Culture & Heritage Award

    About This Project

    5

    CLIENT : Clove Duffield Foundation

    5

    ARCHITECT : BDP

    5

    PROJECT VALUE : £9 million

    Get in touch

    9 + 14 =

    Liverpool FC Anfield Stadium

    Liverpool FC Anfield Stadium

    Liverpool FC Anfield Stadium

    PROJECT OVERVIEW

    Hannan’s were appointed to work on the first scheme for the design of Liverpool Football Club’s new stadium during 2007 with AFL Architects. Following the sale of Liverpool Football club to the new American owners we were appointed to design the building services for their new unique stadium design up to BSRIA Stage E. We worked closely with Architects HKS and the wider design team.

    Our duties included the infrastructure design works comprising major gas water electricity and telecommunications requirements for a new 73,000 seat stadium.

    The services load requirement involved making network connections up to 3 km from the stadium site. We carried out load assessments and calculations to establish the services requirements which were sense checked, tested and compared to known data from other stadia schemes completed. The established loads included 5.5 Mva of

    electrical load, 90 Litres per second of water, 1600 M3 per hour of natural gas and telecoms and Fibre optics requirements to the stadium.

    The ICT requirements for the stadium operation included a review of all opportunities & requirements including wireless network access. The infrastructure to the stadium was designed to accommodate the requirements including diverse network routing and entry points for security of supply.

    Offsite infrastructure issues included coordination with traffic and matchday access requirements, an unexploded bomb from WWII and liaison with the infrastructure companies to manage the works to achieve completion in the closed season. The electrical supply required the establishment of a new twin 10 Mva primary substation.

    The onsite coordination included close integration between each incoming service with integration of existing and proposed ground levels, together with consideration of temporary hall roads phasing and diversions.

    European funding sources were used to support the scheme. The enabling contract was let on a design and build basis and the team were novated to the main contractor to complete the commissions.

    All off site mains incoming services were completed on time and to budget as an enabling package for the then planned stadium.

    About This Project

    5

    CLIENT : Liverpool Football Club

    5

    ARCHITECT : HKS Architects

    5

    PROJECT VALUE : £400 million

    5

    CONTRACT DURATION: 2007 - 2009

    Get in touch

    14 + 15 =