Dow Chemicals HQ progressing on site

Dow Chemicals HQ progressing on site

Hannan Associates are continuing to work in conjunction with main contractor Seddon Construction, architect Leach Rhodes Walker & structural engineers Integra Consulting, under Muse Developments to deliver new ‘Office and Research & Development Headquarters’ for the prestigious Dow Chemicals.

Dow Chemicals has pre-let the two-floor 26,037sqft unit to house its national management team, technical and sales office and will include a product research and development facility.

The project is now approaching completion and we are continuing to attend site, whilst adhering to social distancing guidance, in order to monitor the progression of on-site works and ensure the quality of installations being undertaken by Seddon and M&E subcontractor HE Simm.

Hannan have been providing Building Services & Utility Infrastructure consultancy, with the current development of Plot 3300 being one of the few remaining areas for development. We are responsible for the delivery of the performance specification for the CAT A MEP services design, which incorporates a multitude of tenant driven requirements; from specific incoming power criteria, to zoned sprinkler system and bespoke ventilation strategy.

Thomas Cutt

Thomas Cutt

Mechanical Design Engineer

Email: [email protected]

Phone: +44(0)161 337 2200

Planning Submitted for Store Street Manchester

Planning Submitted for Store Street Manchester

Amidst all the difficulties, it has been great to see positive news emerging from our industry; signs that deals are still being done, clients pushing forward with development plans and the planning system still moving. 

We were very pleased to see the Store Street residential scheme submitted for planning in April. 

Store Street is an affordable housing scheme situated along the Ashton Canal in the Piccadilly Village area of Manchester. The scheme, being developed by Clarion Housing and H20 Urban, includes 63 new apartments and 3 town houses, which are to be constructed over 11 storeys. 

Hannan Associates have been appointed to develop the MEP services design, undertake design stage Part L Compliance checks and to produce an Energy Statement in support of the planning application which has been submitted to Manchester City Council. 

The apartments consist of one and two bed types and are contained within a triangular shaped block on the lower levels, with a more traditional block tower construction emanating at six storeys high. Each of the 2-bed town houses is enveloped by the building and are constructed over ground and the first level, with each being accessed directly off Store Street. 

At handover, fifty percent of the car parking spaces will be supplied by electric vehicle charge points, with passive provision for the remaining 50% of spaces. Secure cycle storage has also been included and a proportion of ‘green space’ incorporated into the scheme design by provision of an accessible terrace area on the sixth level.

It is currently proposed that an ‘all-electric’ services strategy will be adopted for both the apartments and the town houses in order to help future-proof the homes and contribute towards Manchester’s 2038 Net Zero Carbon Target.

Other members of the team include AHR Architects, WSP, Chroma Consulting and Walker Sime. 

Hannans have supported our clients with the delivery of residential accommodation to the value of around £400M in recent years. We have played a key role in developments for the For Sale, Private Rental, High End, Social and Retirement markets. To find out more about our Residential experience please click here to see our brochure: 

If you would like to talk to us about a future project please get in touch.

Jamie Hall

Jamie Hall

Director

Email: [email protected]

Phone: +44(0)161 337 2200

Mountpark Warrington Omega II Progressing on Site

Mountpark Warrington Omega II Progressing on Site

Mountpark Warrington Omega phase II is the latest development at Omega South distribution park.

This state-of-the-art logistics development funded by Mountpark Logistics comprises three units of 307,807 sq ft, 225,312 sq ft and 203,180 sq ft.

Each unit will include a rooftop solar PV array and battery storage that will meet about 50 per cent of the facility’s incoming supply capacity.

Hannans are providing MEP design and monitoring services, infrastructure services consultancy and BREEAM assessment.

We are pleased to join Chetwood Architects, Doig & Smith, WSP and Projex Solutions on the project design team, and the principal contractor McLaren Construction.

The scheme is under construction and the first two units are due to be complete by January 2021.

The Hannan industrial & logistics team have been involved with the development of Omega Business Park since 2012; providing Building Services & Utility Infrastructure consultancy to Omega Warrington Ltd and several of the tenants across both the North and South sites.

Hannan Associates are experts in Building Services Engineering and Infrastructure solutions for the industrial sector and In total we have helped our clients with the development of over 3.0 million square feet of industrial and logistics space. Please click here to see our brochure:

If you would like to talk to us about a future project please get in touch.

John Walker

John Walker

Director

Email: [email protected]

Phone: +44(0)161 337 2200