Hannan Associates are continuing to work in conjunction with main contractor Seddon Construction, architect Leach Rhodes Walker & structural engineers Integra Consulting, under Muse Developments to deliver new ‘Office and Research & Development Headquarters’ for the prestigious Dow Chemicals.

Dow Chemicals has pre-let the two-floor 26,037sqft unit to house its national management team, technical and sales office and will include a product research and development facility.

The project is now approaching completion and we are continuing to attend site, whilst adhering to social distancing guidance, in order to monitor the progression of on-site works and ensure the quality of installations being undertaken by Seddon and M&E subcontractor HE Simm.

Hannan have been providing Building Services & Utility Infrastructure consultancy, with the current development of Plot 3300 being one of the few remaining areas for development. We are responsible for the delivery of the performance specification for the CAT A MEP services design, which incorporates a multitude of tenant driven requirements; from specific incoming power criteria, to zoned sprinkler system and bespoke ventilation strategy.

Thomas Cutt

Thomas Cutt

Associate Mechanical Design Engineer

Email: [email protected]

Phone: +44(0)161 337 2200

Pin It on Pinterest

Share This