PROJECT OVERVIEW

This £10.4m office building in Carlisle, is the new headquarter offices for Cumbria County Council, and will form an essential component in the council’s transformation.

The aspiration of the Council was to occupy a building which is sustainable, and integrates passive design, low energy technologies and reduced maintenance requirements. In response the primary focus of the design of the building, and the associated MEP services installations was to maximise natural ventilation, natural day lighting, minimise heat gains within the building and incorporate renewable and low energy technologies in order to reduce energy consumption and the associated production of carbon dioxide.

The building services installations contribute to the overall sustainability of the building by incorporating renewable, low energy systems and sustainable technologies such as;
• Natural/Mixed Mode Ventilation
• Variable Refrigerant Flow simultaneous sheeting & cooling systems to cellular spaces
• Free cooling using outside air
• Night time cooling
• LED lighting technology
• Rainwater harvesting to serve flushing cisterns
• Roof mounted photovoltaics

The mechanical and electrical services are designed to maximise flexibility of the open plan office space and to facilitate the possible future sub division of the office area.

About This Project

5

CLIENT : Cumbria County Council & Eric Wright Construction

5

ARCHITECT : AHR Architects

5

PROJECT VALUE : £10.4 million

5

CONTRACT DURATION: June 2014 - September 2016

Get in touch

11 + 2 =

Conwy Council Offices, Colway Bay

Conwy Council Offices, Colway Bay

Coed Pella, Colwyn Bay

PROJECT OVERVIEW

Hannan Associates are very pleased to have been part of the team who delivered Conwy County Borough Council’s new 100,000 sq ft Civic Offices in Colwyn Bay Town Centre after Muse Developments were chosen as the preferred development partner for the scheme during 2015.

The four storey, 100,000 sq ft office building has enabled the council to operate more efficiently and improve services for customers by consolidating staff and services into fewer sites.

The new building is BREEAM 2014 Excellent with an A rated Energy Performance Certificate. Passive design measures to reduce carbon emissions and energy consumption include enhanced insulation to the building envelope and engineered facade design.

The glazed proportion of the building façade and the central atrium maximizes natural daylight to offset the demand for lighting whilst at the same time high performance glazing minimizes thermal losses. To further reduce carbon emissions and energy consumption, the building’s heating and cooling is produced via air source heat pumps, highly efficient LED lighting and roof mounted photovoltaic arrays.

The project won the ‘Regeneration’ category and was also shortlisted for the ‘Design Through Innovation’ category at the RICS Awards 2019, Wales. It has also won the ‘Best Large Commercial Project’ award at the North Wales LABC Building Excellence Awards 2019. It was shortlisted for a BCO Northern Award 2019 in the ‘Corporate Workplace’ category and an Insider Property Awards 2019 Wales for ‘Development of the Year’.

 

Coed Pella Takes the ‘Regeneration’ Prize

Coed Pella shortlisted at the RICS Awards 2019, Wales

Conwy Council Offices Complete!

About This Project

5

CLIENT : Muse Developments

5

ARCHITECT : AHR Architects

5

PRINCIPAL CONTRACTOR: Bowmer & Kirkland

5

PROJECT VALUE : £36 million

5

CONTRACT DURATION: October 2015 – November 2018

Get in touch

6 + 2 =

City Place, Chester

City Place, Chester

City Place, Chester

PROJECT OVERVIEW

We are working with Muse Development and Aedas RHWLArchitects on the development plans for the transformation of the area aroundChester railway station.

We are currently involved with Phase 1 of the development which includes the first office building,One City Place. Completed in February 2016 this £20M office development is 70,000 sq ft with six-stories.

We are also providing site wide appraisal of the utilities, diversions & development loads, developing a design and procurement strategy and a Sitewide lighting Strategy.

The masterplan designed by RHWL Architects has the capacity to deliver 500,000 sq ft of prime office space, 200 residential units, restaurants, leisure facilities, car parking and new public spaces including enhancements to the area surrounding the Shropshire Union Canal, which runs through the site. It is hoped that these proposed plans have the potential to transform this underused site into a thriving business district, helping to boost economic growth in Chester.

About This Project

5

CLIENT : Muse Developments

5

ARCHITECT : Aedas RHWL Architects

5

PROJECT VALUE : £120 million

5

CONTRACT DURATION: August 2012 –February 2016

Get in touch

11 + 4 =

Addleshaw Goddard Offices, Manchester

Addleshaw Goddard Offices, Manchester

Addleshaw Goddard Offices, Manchester

PROJECT OVERVIEW

Following the successful delivery of Addleshaw Goddard’s new Leeds office at Sovereign Square, Hannan Associates also provided MEP Consultancy services for the CAT B/C Fit Out of their new offices at No.1 St Peter’s Square in Manchester.

The international legal firm has taken two-and-a-half floors of the building and has now successfully relocated from their offices in Barbirolli Square.

We provided MEP services consultancy duties for the project which included working closely with Addleshaw Goddard’s in house department team leaders to develop a bespoke corporate MEP services standards requirements design specification which is to be used to inform future office fit out projects.

Monitoring of the base build/CAT A installations, witnessing of testing and commissioning of the completed installations and checking for compliance with the Agreement to Lease also formed part of our duties.

About This Project

5

CLIENT : Addleshaw Goddard

5

PROJECT MANAGER: Arcadis

5

CONTRACT DURATION: October 2015 - March 2017

Get in touch

15 + 7 =

Addleshaw Goddard Offices, Leeds

Addleshaw Goddard Offices, Leeds

Addleshaw Goddard Offices, Leeds

PROJECT OVERVIEW

We provided MEP Consultancy services for the Cat B/C Fit Out of Addleshaw Goddard’s new offices in Leeds, No.3 Sovereign Square.

Addleshaw Goddard took 51,000 sq ft over three floors within the building developed by Bruntwood and Kier.

Meetings with the Client and associated IT specialists, FM specialists, etc. ensured that all of the client’s requirements were captured. Whilst ongoing monitoring of the base build/Cat A installations, including witnessing of testing and commissioning of the completed installations, guarantee that the project complied with the Developers Specification, and the Agreement to Lease.

We constantly contribute our knowledge from a building services, IT & AV perspective, to aid in the development of a bespoke corporate standards requirements design specification. This document can then be used to inform future office fit out projects.

 

About This Project

5

CLIENT : Addleshaw Goddard

5

PROJECT MANAGER: Arcadis

5

CONTRACT DURATION: October 2015 - December 2016