New Bailey Car Park, Salford

New Bailey Car Park, Salford

New Bailey Car Park, Salford

PROJECT OVERVIEW

As part of English Cities Fund’s £650M Salford Central regeneration plans we provided MEP performance duties for the new 700 space multi-storey car park at New Bailey. 

New Bailey is a high value, high density corporate centre. A Premier Inn hotel and a multi-storey car park have been completed and a 125,000 sq ft office scheme, One New Bailey, is now under construction.  

It has included in numerous awards shortlists including both commercial and infrastructure nominations in the 2016 RICS Awards, and best new car park in the 2016 British Parking Awards, where it went on to win in the Architectural Achievement Award category.

 

About This Project

5

CLIENT : English Cities Fund

5

ARCHITECT : Aedas RHWL Architects

5

PROJECT VALUE : £12 million

5

CONTRACT DURATION: April 2012 - November 2014

Get in touch

3 + 9 =

Stockport Exchange Redevelopment

Stockport Exchange Redevelopment

Stockport Exchange Redevelopment

PROJECT OVERVIEW

We are part of Muse Development’s team, selected as Stockport’s development partner. Stockport Council bought the site in order to create a gateway from the train station to the town centre.

The development includes a high quality office quarter, an attractive public realm area, a hotel, retail units, ease of access to the town centre, and improved car parking for the station.

For Phase 1 of the development we were involved in the design of a new 1,000 space multi-storey car park.

For Phase 2 we were involved in the design and construction of No.1 Stockport Exchange – a 50,000 sq ft office block, a 115 bedroom Holiday Inn Express Hotel, a new pedestrianized public space outside the train station and a new reconfigured road layout to improve station access.

Phase 3 of the development included No.2 Stockport Exchange – a new six-storey, 60,000 sq ft, Grade A office. The building incorporates environmentally friendly design features such as a green roof, photovoltaic panels, LED lighting and ultra-low water consuming fittings. Features include the use of natural daylight and enhanced fabric to minimise the building’s carbon emissions, creating a reduction in its indirect impact on climate change. Our analysis of the scheme included the consideration of connecting the development to Stockport’s proposed heat network.

Proposed plans for Phase 4 include the design and construction of a 64,000 sq ft Grade A office building and 400-space multi-storey car park.

All the buildings have been designed to achieve a BREEAM Excellent rating.

The scheme won in the Commercial Category at the 2018 RICS Awards, ‘Public/Private Partnership of the Year’ at the 2017 Insider North West Property Awards and was nominated for a 2018 BCO Award.

 

2 Stockport Exchange Complete

 

About This Project

5

CLIENT : Muse Developments

5

ARCHITECT : Aedas RHWL Architects

5

PROJECT VALUE : £145

5

CONTRACT DURATION: August 2011 - ongoing

Get in touch

5 + 6 =

Doncaster Civic Quarter

Doncaster Civic Quarter

Doncaster Civic Quarter

PROJECT OVERVIEW

Phase 1 of the £330 M Doncaster Civic Quarter regeneration scheme included the construction of a new 157,500 sq ft civic office building, performance venue, public realm area and refurbished multi storey car park. We undertook the MEP Design for the refurbishment of the 850space multi-storey car park.

The car park was highly praised at the British Parking Awards, narrowly missing out on the best refurbishment award.

We also undertook Client Representative monitoring duties of the MEP services installations during the construction phase of the Civic office building which was designed to achieve a BREEAM excellent rating. The building was highly serviced and incorporated a low energy natural/mixed mode ventilation strategy.

Awards

2013 British Parking Awards – Commendation

About This Project

5

CLIENT : Muse developments

5

ARCHITECT : Potter & Holmes Architects

5

PROJECT VALUE : £2.5 million

5

CONTRACT DURATION: June 2010 – November 2011

Get in touch

1 + 13 =

Blackpool Council Offices, Talbot Gateway

Blackpool Council Offices, Talbot Gateway

Blackpool Council Offices, Talbot Gateway

PROJECT OVERVIEW

Best corporate workplace

Talbot Gateway Central Business District (CBD) is a major mixed-use regeneration scheme, transforming the heart of Blackpool town centre.

The scheme, introduced by Blackpool Council and delivered in partnership with Muse Developments is reviving one of Blackpool’s key gateways into a modern and thriving commercial and family-friendly district for local people and visitors alike.

A masterplan for Talbot Gateway has been developed to provide a new central business and civic quarter with 1.1 million sq ft of development including Grade A offices, a Foodstore, retail units, cafes/restaurants, a fully refurbished multi-storey car park, new transport interchange and hotel.

Bickerstaff House

Bickerstaffe House is the new 125,000 ft² HQ Offices built for Blackpool Council as part of the Talbot Gateway Development.

We were employed by Muse Developments to develop the design of the mechanical, electrical & plumbing services including the environmental services strategy to meet their development brief.

The building has achieved a BREEAM Excellent rating and an A rated Energy Performance Certificate. We undertook Dynamic Simulation Modelling and worked closely with the design team on the incorporation of passive solar shading via vertical fins on the south-west and south-east elevations, high performance solar & fritted glazing and low air permeability in order to reduce heating and cooling loads whilst maximizing natural daylight.

Our detailed design for the MEP services further supplemented this approach by the use of air source heat pumps to provide space heating and comfort cooling, daylight dimming and occupancy control for lighting installations, roof mounted photovoltaic panels and the re-use of waste heat from the data centre. Water usage was reduced via a rainwater harvesting installation to serve the WCs within the core accommodation.

Talbot Gateway Car Park Scheme

As part of the development we provided MEP design services for the refurbishment of the 648 space, 5 level multi-storey car park originally built in the 1930s.

The car park also incorporates ground floor retail units, in keeping with the design of the rest of the development.

The car park was a warded the British Parking Award for ‘Best Refurbishment’ during 2014.

The Talbot Road MSCP beat strong competition from five other shortlisted car parks in the Best Refurbishment category thanks to a creative design that reveals the original 1930s frame through the new elevations, to deliver a contemporary car park that acknowledges its heritage.

About This Project

5

CLIENT : Muse Developments

5

ARCHITECT : Aedas Architects

5

PROJECT VALUE : £23 million

5

CONTRACT DURATION: September 2010 – September 2014

Get in touch

9 + 14 =

Pin It on Pinterest