Freetrade Exchange

Freetrade Exchange

Freetrade Exchange, Manchester

PROJECT OVERVIEW

Freetrade Exchange is a Grade II listed building on Manchester’s Peter Street. The building was originally built as a fabric warehouse in 1868 under the name Harvester House and was renamed after a refurbishment in 2007.

The recent revamp of this six-storey, 36,000 sq ft office building included the conversion of the lower ground floor to a 5,000 sq ft restaurant; the reconfiguration and expansion of the existing entrance; and the creation of a new entrance. The building’s basement features a gym studio, yoga/barre studio, sauna, showers, changing rooms, toilet facilities and a secure cycle storage.

Hannan Associates were employed by Clearbell Capital to undertake the Building Services Engineering Consultancy for the project.

We worked alongside Michael Laird Architects, DW Consulting, DFC, Hann Tucker and Paragon on Clearbell’s design team.

The building’s Grade II listed status meant that the M&E services needed to be carefully designed and coordinated to accommodate the existing exposed structural elements. Routing new M&E services to and throughout the basement was a challenge and required careful consideration and coordination.

A number of energy reducing design measures were incorporated into the CAT A design in order to meet Part L Building Regulations, these included;

o All electric HVAC strategy to the office area

o Air source heat pump installation providing heating and cooling.

o Air source heat pump installation providing domestic hot water.

o Ventilation via AHU’s with variable speed driven fans & heat recovery via thermal wheels.

o Automatically switched power factor correction equipment.

o Low energy lighting installation utilising LED lamp sources.

o Automatic lighting with occupancy control and daylight sensing.

o Regenerative drive technology used in the passenger lifts.

o Automatic BMS controls and energy metering system

An EPC B was achieved with minimal impact to the external listed façade. Our team undertook detailed modelling and energy assessments to identify the additional measures required to achieve this, which included:

o Improved building air permeability

o Improved office lighting power density

o ASHP domestic hot water

o Photovoltaic array

 

About This Project

5

CLIENT : Clearbell Capital

5

ARCHITECT : Michael Laird Architects

5

PROJECT VALUE : £4.8M

5

CONTRACT DURATION: 2021 - 2023

Get in touch

4 + 2 =

Rhodes Business Park

Rhodes Business Park

Rhodes Business Park

PROJECT OVERVIEW

Hannan Associates are working on a 18,966 sq ft industrial unit at Rhodes Business Park in Middleton.

The unit includes office space and is being constructed on a secured perimeter with external car parking.

As a part of our role we are providing:

o Building Services Engineering

o Utilities Infrastructure

o BREEAM Assessment – targeting ‘Very Good’

We are very pleased to be joining Peter Haddon & Partners, Emery Planning, Belshaw, Christopher Smith Associates and Burrows Graham on Oxenwood’s project design team. 

About This Project

5

CLIENT : Oxenwood

5

ARCHITECT : Peter Haddon & Partners

5

PROJECT VALUE: £1.5M

5

CONTRACT DURATION: 2023 - ongoing

Get in touch

9 + 4 =

Tritax Park, Gloucester

Tritax Park, Gloucester

Tritax Park, Gloucester

PROJECT OVERVIEW

Hannans are providing building services engineering consultancy for Tritax Park, Gloucester

Stroud City Council resolved to grant planning permission for Tritax’s hybrid planning application including two industrial units of 163,500 sq ft and 241,000 sq ft with outline planning permission for a further c.700,000 sq ft of build-to-suit.

We are very pleased to be working alongside AJA Architects, Framptons, Feasibility Limited, Trinity Property Consultants, Burrows Graham,  Ridge, WSP UK , EPC UK on the project design team.

The site is situated adjacent to junction 12 of the M5 offering occupiers prominence and excellent transport links.

The buildings are due to be delivered mid-2025.

About This Project

5

CLIENT : Tritax Big Box

5

ARCHITECT : AJA Architects

5

CONTRACT DURATION: 2021 - ongoing

Get in touch

14 + 3 =

Liverpool Waters, Central Park

Liverpool Waters, Central Park

Liverpool Waters, Central Park

PROJECT OVERVIEW

Located at Central Docks the 4.7 acre park will be one of the largest green spaces in the city and is an important part of this next stage at the Liverpool Waters Development.  Plans for the park include planting thousands of trees, community gardens, play areas as well as spaces for sports and recreation and support for wildlife.

Previously a derelict site, the Central Docks neighborhood will be a mixed use business and leisure district including a new cultural hub.

Hannan Associates are providing Utilities Infrastructure and Building Services Engineering support for the park including……

o Establishing plant space requirements

o Utility supply applications for park utility services

o Lighting design and CCTV coordination

o Park containment routing for power, lighting, data and water irrigation system

o Pop up power, wireless network, and interactive help points consideration

o Park Pavilion M&E proposals

Planning also includes approval for the creation of essential infrastructure which will support the delivery of thousands of new homes, commercial, retail and leisure space within the Central Docks district over the next ten years, in line with the Liverpool Waters Central Docks Neighbourhood Masterplan.

Our team mates on the project include Walker Sime, Curtins Consulting, Planit IE and Arup.

About This Project

5

CLIENT : Peel Land and Property

5

CONTRACT DURATION: 2022 - ongoing

Get in touch

15 + 14 =

Tritax Park, Kettering

Tritax Park, Kettering

Tritax Park, Kettering

PROJECT OVERVIEW

The Hannan Industrial team are providing building services engineering consultancy for Tritax Park, Kettering.

The park has outline planning permission for 2.3 million sq ft of logistics floor space.

Unit 1 Greggs PLC new national distribution centre is a 311,000 sq ft cross dock logistics facility, which is currently under construction, is being built to Net Zero Carbon in Construction and is currently targeting BREEAM Very Good and EPC A rating.

Unit 2 – a 321,875 sq ft facility, completed in 2023 and is occupied by Iron Mountain.

Unit 3 -a 956,000 sq ft facility, pre let to a major client is currently under construction. It is being built to Net Zero Carbon in Construction and will meet BREEAM ‘Excellent’ certification and EPC ‘A’ rating.

We are very pleased to join Stephen George and Partners, Framptons, Feasibility Limited, Trinity Property Consultants, WSP UK , EPC UK on the project design team.

The site is situated directly alongside the A14 “Trans-European” freight route at Junction 9, offering occupiers prominence and excellent transport links to the national motorway and trunk road network.

About This Project

5

CLIENT : Tritax Big Box

5

ARCHITECT : Stephen George and Partners

5

CONTRACT DURATION: 2021 - ongoing