2 Stockport Exchange Complete

2 Stockport Exchange Complete

The latest phase of development at the award winning Stockport Exchange is now complete. 2 Stockport Exchange is a six-storey, 61,500 sq ft, Grade A office soon to be home to global chemical company BASF, who will take 21,500 sq ft of the office building as their UK headquarters.

Hannan Associates provided Building Services Engineering & BREEAM consultancy for this project, the third phase of development work at Stockport Exchange.

2 Stockport Exchange incorporates environmentally friendly design features such as a green roof system, secure cycle store, showers and lockers facilities to encourage people to cycle to work and low energy LED lighting throughout. Features include the use of natural daylight and enhanced building fabric performance to minimise the building’s carbon emissions, creating a reduction in its indirect impact on climate change. The building has been designed to achieve a BREEAM ‘Excellent’ rating and an EPC ‘A’ rating.

We are proud to be part of Muse Development’s team for this development and witness first hand the transformation of this area over the last ten years to a high quality commercial quarter incorporating attractive public realm, a hotel, retail, improved car parking and better connectivity between the station and the rest of the town centre.

Muse Developments are Stockport Council’s development partner for Stockport Exchange, which forms part of the council’s wider £1bn town centre regeneration plan for Stockport.  Other members of the project team include Aedas ArchitectsRPS GroupGillespies, Buro Four, Curtins Consulting and main contractor GMI Construction Group.

John Walker

John Walker

Director

Email: [email protected]
Phone: +44(0)161 337 2200
David Green

David Green

Mechanical Design & Building Physics Engineer

Email: [email protected]

Phone: +44(0)161 337 2200

Dow Chemicals HQ progressing on site

Dow Chemicals HQ progressing on site

Hannan Associates are continuing to work in conjunction with main contractor Seddon Construction, architect Leach Rhodes Walker & structural engineers Integra Consulting, under Muse Developments to deliver new ‘Office and Research & Development Headquarters’ for the prestigious Dow Chemicals.

Dow Chemicals has pre-let the two-floor 26,037sqft unit to house its national management team, technical and sales office and will include a product research and development facility.

The project is now approaching completion and we are continuing to attend site, whilst adhering to social distancing guidance, in order to monitor the progression of on-site works and ensure the quality of installations being undertaken by Seddon and M&E subcontractor HE Simm.

Hannan have been providing Building Services & Utility Infrastructure consultancy, with the current development of Plot 3300 being one of the few remaining areas for development. We are responsible for the delivery of the performance specification for the CAT A MEP services design, which incorporates a multitude of tenant driven requirements; from specific incoming power criteria, to zoned sprinkler system and bespoke ventilation strategy.

Thomas Cutt

Thomas Cutt

Associate Mechanical Design Engineer

Email: [email protected]

Phone: +44(0)161 337 2200

Pin It on Pinterest