For a practical comparison, most users often look at 1 deposit casino, provided they check the licence carefully. Welcome offers catch the eye, yet their true worth rests on the wagering terms, which repay a calm read. Payment options need to be secure, and the payout time is usually one of the most telling indicators of a serious casino. The range of titles is usually wide, from video slots to roulette, bringing fans genuine variety. Live dealer play draws in users with real-time streams, and the stream quality drive the entire experience. A responsive help desk marks the standard whenever questions arise, above all if clear answers are available. Payouts expose the real nature behind a casino, so clear limits and steady speed inspire trust. Sensible gaming must remain a priority, so reality checks and clear budgets always support the player. A genuine licence is the first thing to confirm, because it proves that the operator respects firm standards. Welcome offers look tempting, yet their actual benefit rests on the wagering terms, which reward a careful look. Banking methods need to be convenient, and the cash-out period is usually one of the most telling marks of a honest brand. The range of titles tends to be generous, from video slots to roulette, offering users real choice. Live dealer play appeals to fans with real-time streams, and the stream quality define the overall atmosphere. A responsive help desk makes the tone whenever questions arise, particularly if quick replies are on hand. Payouts reveal the honest side behind a casino, so clear limits and prompt handling earn confidence. Sensible gaming should stay in focus, so reality checks and clear budgets really safeguard the user. A genuine licence is the first thing to check, because it proves that the operator follows strict requirements. Welcome offers look tempting, yet their real value rests on the wagering terms, which deserve a close review. Deposit choices need to be convenient, and the withdrawal speed is usually one of the most telling signs of a fair site. The range of titles tends to be broad, from video slots to roulette, giving players plenty of options. Live dealer play appeals to players with real-time streams, and the stream quality shape the whole session. In the end, a thoughtful selection depends on facts, so take your time, verify details and keep control.
Blackpool Civil Service Hub Now Complete

Blackpool Civil Service Hub Now Complete

Image Courtesy of Joel Chester Fildes

Vinci Building have completed work on the new, £100m office building in Blackpool, which forms part of the third phase of the Talbot Gateway regeneration scheme led by Muse.

The seven storey, 215,000 sq ft office building is now home to over 3000 staff from the Department of Work and Pensions.

 

Image Courtesy of Joel Chester Fildes

Hannan Associate’s Appointment

Hannan Associates  provided Building Services Engineering Consultancy  on the project and our key duties included: 

  • MEP services CAT A & CAT B performance design duties
  • Passive design analysis
  • Low & zero carbon feasibility studies
  • Design for Performance Operational Energy Modelling via advanced dynamic simulation
  • Construction monitoring
  • BREEAM Assessor and Certification

The Building’s Green Credentials

The building has been designed to be low energy with passive measures prioritised to reduce energy demand. Low-carbon heating and cooling to the office has been provided via air source heat pumps and high efficiency chillers serving low specific fan power fan coil units. Demand control ventilation has also been provided via central air handling units incorporating heat recovery to improve indoor air quality while saving energy during periods of reduced occupancy. An extensive PV array has been provided.

Green outdoor spaces with Sustainable Urban Drainage have also been provided, enhancing local biodiversity and promoting staff health and wellbeing. Extensive Cycle Spaces and changing facilities reduce reliance on vehicle journeys, reducing associated transport emissions.

The bulding was designed to achieve BREEAM ‘Excellent’ certification and an Energy Performance Certificate rating of A. The Base Building operational energy is aligned with UK GBC’s interim NZC target for 2030 – 2035.

We are pleased to have been a part of Muse’s design team working alongside Make Architects, RPS, Chroma, Arup, Aecom and main contractor VINCI Building.

 

Blackpool Talbot Gateway Regeneration Scheme

Hannan Associates were also part of the team who designed and delivered Blackpool Council’s home, the award winning Bickerstaffe House. This first phase of development at Talbot Gateway, which started twelve years ago, also included the refurbishment of the 1930s, 5 level Talbot Road multi-storey car park.

The Talbot Gateway regeneration scheme is transforming Blackpool town centre and will comprise of a new business district and civic quarter, grade A offices, retail space, event space and a new public transport interchange. It is hoped that this new development will help to drive footfall in the town centre and support Blackpool’s economic growth.

 

Image Courtesy of Joel Chester Fildes

 

Offices Workspace Expertise

New Build :: Fit Out :: Retrofit :: Repurpose

Offices & workspace, in all forms, have been at the core of our business for over 40 years.

Whether it be speculative offices designed to attract potential tenants; a highly customised HQ; or the refurbishment of an existing building,our engineers understand what clients and occupiers expect and need from the 21st Century modern workplace.

Our extensive experience in this sector, along with continued training and research, means that we can contribute in-depth knowledge of a wide range of design solutions available for office environments and advice on cost in use.

 

If you would like to talk to us about a future project please give us a call or drop us an email….

 

 

 

Andrew Carrington

Andrew Carrington

Director

Email: [email protected]
Phone: +44(0)161 337 2200

Freetrade Exchange, Manchester

Blackpool Council Offices, Talbot Gateway

Coop HQ, One Angel Square, Manchester

Senior Electrical Building Services Design Engineer

Senior Electrical Building Services Design Engineer

We are looking for a Senior Electrical Building Services Design Engineer to join the team at our busy Manchester office.

Our team are key to our success. We need enthusiastic, inspired and proactive people who are committed to new ways of thinking and working. 

The Role 

We are looking for a self motivated, driven Senior Electrical Design Engineer to join our Electrical Design team. The ideal person will play a major role in the progression of our business going forward and will be keen to progress to Associate or Director level within the next three years.

You will be interested in team management, leadership and business development and capable of hands on design production alongside strategic and client management.

This is an exciting opportunity for someone looking for a challenge, to help lead, develop and grow our team and business.

 The Ideal Person

  • Relevant Degree

  • Membership of (or progressing towards) MCIBSE or IET

  • Solid current commercial design skills

  • Capable of developing & maintaining client & design team relationships
  • Responsible, flexible, agile and progressive

  • Interested in team and business management

  • Experience of our key Sectors:

Office & Workspace :: Industrial & Logistics :: Residential :: Retail & Leisure :: Stadia :: Data Centres   

Salary Package  

-Competitive Salary with real progression opportunities

-‘Vitality’ Private health care

-‘Paycare’ Health care cash plan

-Pension contributions

-25 Days holiday

-Death in Service Cover

 

Workplace Arrangements

-Option to work two days at home

-Option to work flexible hours

-Ongoing training & development encouraged

-Community Engagement & Volunteering encouraged

-Large, bright, spacious office with your own dedicated desk

-Free Parking

-Close to the motorway network

-Short drive from Manchester City Centre

-Meeting room & break out spaces equipped with virtual meeting tech

The Team

We recognise that we would not be here without the continued loyalty and hard work of all our team, and we feel proud that so many of our engineers have worked here together over such a long period of time, some for over 25 years. Through this strong, long serving work force we have developed lasting relationships with many clients & consultants, ensuring that 80% of our turnover is achieved through repeat business.

William E Hannan and Associates Limited is committed to providing equal opportunities for all employees, including job applicants. The Company provides equal opportunities regardless of disability, skin colour, race, religion, religious or philosophical beliefs, age, sex, pregnancy and maternity, marital status, sexual orientation, gender reassignment, ethnic origin or national origin.

We recruit and develop team members who are committed to the following values:

• Accessible and approachable
• Responsive and supportive
• Open and accountable
• Respectful of other people
• Committed to equal opportunities

 

 

 

 

Our Clients

We provide a totally client orientated service focused on low energy & innovative concepts. We prioritise developing long-term, collaborative relationships with clients and consultants and around 80% of our turnover is from repeat business. You will be involved in helping to develop these long term relationships as well as creating new ones.

Current clients include:

-Muse

-Tritax Big Box

-Harworth

-MUFC

-Bentley

-Peel Waters

-Genr8 Developments

-Vinci Construction

-Graham Construction

 

Projects

The role would involve working on projects across our key sectors:

Office & Workspace :: Industrial & Logistics :: Residential :: Retail & Leisure :: Stadia

Many of our projects are part of wider mixed-use regeneration schemes and current projects include:

Birkenhead Town Centre

Liverpool Waters

Talbot Gateway Blackpool

Salford Central

Tritax Park, Kettering

Prestwich Village

Arena Central Birmingham

Radcliffe Hub

MUFC Old Trafford

Sustainability 

Every project now has a Sustainability strategy and considered path towards achieving Net Zero Carbon and the need to improve the performance of buildings has significantly enhanced our role within the design teams. The services we provide are constantly evolving to meet new legislation and changing market needs & expectations. To meet the increasingly complex set of targets & standards that developments must meet we have in house sustainability and energy modelling teams.

You will have good understanding of current sustainable design practices and technologies and possess relevant design and installation experience. 

As building services engineers we have a big part to play in helping the built environment meet Net Zero Carbon and other Sustainability goals. In order to continue helping our clients drive this change, we need to continue to develop the skills and knowledge of our long standing team, as well as recruiting fresh talent to the team.

Our Story

Hannan Associates, is an independent Building Services Engineering consultancy based in Manchester, founded 40 years ago by Bill Hannan. The business is now led by Directors Ian Joyce, John Walker and Jamie Hall.

We focus on providing Building Services Engineering, Sustainability and Utilities Infrastructure Consultancy, tailored around the unique requirements of each of our clients.

Our head office is based in Denton Manchester, though we work on projects throughout the UK.

 
Carolyn Sidebotham

Carolyn Sidebotham

Recruitment Manager

Email: [email protected]
Phone: +44(0)161 337 2200
New BREEAM Services: LCC & LCA Reporting & Analysis

New BREEAM Services: LCC & LCA Reporting & Analysis

The Hannan Sustainability team now has in house expertise to deliver Life Cycle Assessment & Life Cycle Costing reporting and analysis to support delivery of the early stage Mat 01 & Man 02 BREEAM credits. Two relatively cost effective, high impact BREEAM credits.

Mat 01 Environmental impacts from construction products – Building life cycle assessment (LCA) – helping project teams to understand the overall environmental impact of the building design

Man 02 – Life cycle cost (LCC) and service life planning – provide credible information on the maintenance and operational costs of a building

By undertaking a Life Cycle Assessment early-on during the project concept process, we can help our clients and design teams identify and implement necessary environmental impact reduction measures at the lowest possible cost.

By providing our clients’ with life cycle cost advice, we are able to identify a suite of alternative product choices that will help reduce future materials replacement costs, saving our clients money.

If you would like any information about Life Cycle Assessment & Costing or anything else regarding BREEAM Assessment, please get in touch.

Tim Bell

Tim Bell

Head of Sustainability

Email: [email protected]
Phone: +44(0)161 337 2200

New £7m Substation for Birkenhead

New £7m Substation for Birkenhead

Ameon Utilities have commenced construction of a new, £7m substation in Birkenhead, marking a significant milestone in the ongoing  regeneration of the Wirral.

Hannan Associates worked alongside Ameon and the client, the Wirral Growth Company, to develop a utilities infrastructure strategy that would support rising energy demands and help future proof Birkenhead and its neighbouring towns for future development plans.

The Birkenhead substation is set to play a crucial role in upgrading the region’s energy capabilities, meeting the demands of its expanding population and commercial activities. By providing a stable and efficient power supply, the substation will significantly reduce the likelihood of power outages, ensuring a more reliable service for both residents and businesses. This enhanced infrastructure is essential for supporting the area’s continued growth and regeneration, enabling new developments and economic opportunities.

The substation stands to deliver substantial environmental and economic benefits. The new power will deliver all electric buildings using heat pump technology to take advantage of the decarbonisation of the national grid. This focus on efficiency will help reduce carbon emissions, contributing to the area’s broader sustainability targets.

With its capacity, it will facilitate the integration of renewable energy sources, contributing to a more sustainable and resilient power grid. This forward-thinking approach not only addresses current needs but also positions Birkenhead and the broader Wirral area for long-term success.

Fellow project team members for the new sub-station includes: Ameon Utilities;  Buro Four and Abacus.

This development is part of the Wirral Growth Company’s wider masterplan for Birkenhead town centre. Hannan Associates have been involved with the scheme since 2017 providing Utilities Infrastructure, Building Services Engineering and BREEAM consultancy. The Wirral Growth Company is a joint venture between Wirral Council and Muse.

Previous phases of work included the construction of two new Grade A office buildings, totalling 150,000 sq ft, one of which is now occupied by Wirral Borough Council.  During this phase, the project included the demolition of 27 retail units, for which we organised multiple complex infrastructure diversions of HV, LV, BT, Virgin, Drainage, Gas and Water services. 

 

Ian Joyce

Ian Joyce

Director

Email: [email protected]
Phone: +44(0)161 337 2200

Wirral Regeneration

Liverpool Waters

DWP Hub, Talbot Gateway Blackpool

BREEAM Version 7 Coming Soon – Are You Ready?

BREEAM Version 7 Coming Soon – Are You Ready?

BREEAM Version 7, planned to be released later this year, sets new standards for building performance, aligned with global decarbonisation efforts. The comprehensive overhaul has adopted new minimum standards for achieving BREEAM ‘Excellent’ and ‘Outstanding’ ratings, with an emphasis on operational & embodied carbon reduction and wellbeing.

We have summarised some of the key changes below.

We are keen to help you understand the implications these changes will have on your future projects so please let us know if you would like to discuss BREEAM Version 7 with our team.

It may also be an opportunity for you to register any existing projects against the current BREEAM version to shield you from the more onerous requirements and costs of the new standard. We can of course help you with registration and progression of these projects.

Energy and Carbon

Reduced emphasis on the demand metric and more focus on performance outcomes.
New credits that focus on the prediction of a building’s operational energy use and carbon emissions aligned with NABERS.
Change to EV charging requirements that require a minimum allocation of 10% of parking spaces for EV charging stations and installing cable routes for 20% of parking spaces is required.
A new credit related to flexible demand response that recognises installed electrical building systems which have the capability to automatically modify their electricity consumption patterns in response to signals from the electricity supplier there by supporting grid stability and reducing peak energy use.
A new credit that requires installed controls that enable building servicing systems to respond more efficiently to the demand for energy services.

Health and Wellbeing

New credits rewarding advanced lighting control systems that enhance both comfort and energy efficiency and the benefits of lighting that supports a healthy circadian rhythm. Updated approach to daylight calculations.

Ecology and Pollution

New requirements promoting sustainable site selection practices and updates that include new benchmarks to align with English Biodiversity Net Gain law.
New prerequisite that mandates all refrigerant gases have zero ozone depletion potential.

Carbon and Materials

BREEAM ‘Excellent’ now requires LCA and embodied carbon reporting, while ‘Outstanding’ ratings require a minimum of five credits to be achieved.
A new methodology for Building Life Cycle Assessment (LCA) that includes calculations and reporting of LCA and Embodied carbon at building level during concept design, technical design, and post-construction.

Water

A new credit that requires projects to predict water consumption based on expected occupancy rather than standard occupancy.
Projects can earn up to two standard credits and two exemplary credits for accurately predicting water use, setting targets for in-use water consumption, and committing to measuring actual water use post-occupancy.
Tim Bell

Tim Bell

Head of Sustainability

Email: [email protected]
Phone: +44(0)161 337 2200
Matthew Dalley

Matthew Dalley

Senior Energy & Sustainability Consultant

Email: [email protected]
Phone: +44(0)161 337 2200
Charlotte Becker

Charlotte Becker

Graduate Sustainability Engineer

Email: [email protected]
Phone: +44(0)161 337 2200

Pin It on Pinterest