LOC8 Business Park, Maidstone

LOC8 Business Park, Maidstone

LOC8 Business Park, Maidstone

PROJECT OVERVIEW

Hannan Associates are working for Clearbell Capital on the development of this new mixed-use business park, known as LOC8. This new employment area, which has the potential to create up to 1,200 new jobs will deliver a range of modern and sustainable buildings.

As a part of our role we are providing:

o Building Services Engineering

o Utilities Infrastructure

o Sustainability Consultancy

o BREEAM

Phase 1 was completed in May 2023 and includes eleven units of 5,000 sq ft to 60,000 sq ft, which have achieved a BREEAM “Very Good” rating. Occupiers include: Zehnder; Hitachi Construction; Edmundson Electrical; and AT&T.

Phase 2 of the development reached practical completion in December 2024, adding another 186,900 sq ft to the business park across 7 units. Units are pre-let to: Technical Fixings Solutions; Huws Gray; Nivek Catering Supplies; and Ocura Healthcare, with three units remaining.

Each of the units are built to BREEAM “Excellent” standard, achieving EPC A+ ratings, and have been provided with electric vehicle charge points and solar PVS.

Responsibly sourced and climate resilient materials were a key driver during procurement and installation. Extensive landscaping and new habitats have been provided across the sight to support existing species and enhance biodiversity.

We have been working alongside Belshaw, PRC Architects, EPCA, Lloyd Bore, Savills, Goodrich Consulting, Patrick Parsons on the design team.

About This Project

5

CLIENT : Clearbell Capital LLP

5

ARCHITECT : PRC Architects

5

CONTRACT DURATION: 2020 - ongoing

Get in touch

14 + 14 =

Radcliffe Hub

Radcliffe Hub

Radcliffe Hub

PROJECT OVERVIEW

Hannan Associates are part of the team delivering the new Civic Hub in the heart of Radcliffe town centre.

With backing from the government’s Levelling Up Fund the hub will become the new home for leisure in Radcliffe, together with a new library, learning and community spaces and enhanced support for health and wellbeing. The new Civic Hub will not use any fossil fuels and is targeting Net Zero Carbon in operation.

The scheme also includes the renovation of the Markets Chambers to host new retail, office and studio space, the refurbishment of the Market Hall basement for multi-purpose events space and improvements to the surrounding town centre public spaces.

Our team is currently providing MEP engineering consultancy duties, building physics and sustainability services.

We join Pozzoni Architecture, Alan Johnston Partnership, PlanIT, Bespoke Fire and Sutton Sustainability on Vinci Building’s design team working for Bury Council.

About This Project

5

CLIENT : Bury Council & Vinci Building

5

ARCHITECT : Pozzoni Architecture

5

PROJECT VALUE: £40M

5

CONTRACT DURATION: 2021 - ongoing

Get in touch

4 + 5 =

Prestwich Village

Prestwich Village

Prestwich  Village

PROJECT OVERVIEW

Hannan Associates are currently working to deliver a £100million regeneration scheme within Prestwich Town Centre. The scheme is being brought forward via a joint venture partnership formed between Muse & Bury Council.

Proposed works for the first phase of Prestwich Village include:

o A Community hub building with a library and community space

o Retail and leisure spaces

o New market hall

o Village square.

o Multi-storey mobility hub including 20% EVC provision

 

Our role includes the following:

o Assessing works associated with existing utilities networks to accommodate the new development proposals.

o Consultation regarding new utility supply requirements.

o Providing MEP design duties for each plot and the associated public realm.

o Assessing the anticipated building performance using operational energy modelling techniques.

o Undertaking the BREEAM assessments for the relevant plots.

Each of the plots have been designed to reduce operational energy and carbon emissions, employing a fossil fuel free all-electric strategy.

Passive measures have been prioritised to reduce energy demand, including enhanced fabric performance and air permeability, along with optimised glazing design.

Active measures have been taken to optimise the energy efficiency of fixed base build systems, i.e. Mechanical ventilation incorporating heat recovery, low flow sanitaryware, energy efficient LED lighting and controls systems.

Low & Zero Carbon Technologies have been incorporated where applicable in the form of high efficiency heat pumps to generate space heating, and allocation of dedicated zones at roof level for installation of a PV array.

Each of the schemes have been designed to achieve a minimum of BREEAM ‘Excellent’ rating.

Proposed works for the second phase of the scheme includes 200 new homes, a mix of apartments and townhouses.

We are working alongside Jon Mathews Architects; Chroma Consulting; Planit, Civic Engineers; MAC Construction Consultants; Hoare Lea; Design Fire Consultants, & Asteer Planning on the design team.

About This Project

5

CLIENT : Muse & Bury Council

5

ARCHITECT : Jon Matthews Architects

5

PROJECT VALUE: £100M+

5

CONTRACT DURATION: 2023 - ongoing

Stockport Exchange Redevelopment

Rochdale Riverside

Radcliffe Hub

Get in touch

12 + 10 =

High Park Street, Liverpool

High Park Street, Liverpool

High Park Street, Liverpool

PROJECT OVERVIEW

High Park Street was the final phase of Placefirst’s transformation of Liverpool’s Welsh Streets neighborhood .

The redevelopment comprised of 13 new build homes and a small community hub and completed in Summer 2024. The newly built homes consist of three-bedroom houses and two-bedroom apartments.

Hannan Associates provided Building Services Engineering consultancy for the new homes, including:

o Incoming utilities design & coordination

o Develop the plant space & services distribution strategy

o Consultation on Part L compliance

o PV array output & feasibility analysis

o MEP systems design

o MEP services performance specification

o Site monitoring & progress reporting during construction

Hannan Associates worked alongside MBED Architects , Markhams, Curtins Consulting, Complete Sustainability Solutions and Hann Tucker Associates on Placefirst’s design team, with main contractor Urbanise Construction delivering the scheme.

ABOUT THIS PROJECT

5

CLIENT : Placefirst

5

ARCHITECT : MBED Architects

5

CONTRACT DURATION : 2022 - 2024

Get in touch

12 + 10 =

Alder Hey, Ronald McDonald House

Alder Hey, Ronald McDonald House

Alder Hey, Ronald McDonald House 

PROJECT OVERVIEW

Hannan Associates are providing Building Services Engineering consultancy for the refurbishment of Ronald McDonald House Alder Hey at the Alder Hey Children’s Hospital.

The refurbishment works will include a complete refit of all bedrooms and ensuite bathrooms and adding family kitchens to each floor. Interconnecting rooms will be created for larger / blended families.

The dayroom facilities will be improved to offer complimentary services such as hairdressing, yoga and family support.

There will also be a re-landscaped garden for all age groups.

The Ronald McDonald House Charity provide free ‘home away from home’ accommodation for families whose children are undergoing treatment, giving them a warm and welcoming environment where they can stay for as long as they need.

We are delighted to be working alongside AEW Architects, MAC Construction, Urban Green, Heyne Tillett Steel, Hydrock and Mike Jackson Associates on the project design team.

ABOUT THIS PROJECT

5

CLIENT : Ronald McDonald House Charities

5

ARCHITECT : AEW Architects

5

CONTRACT DURATION : 2022 - ongoing