PROJECT OVERVIEW

Hannan Associates are very pleased to have been part of the team involved in the development of a new six-screen Savoy cinema and restaurant in Doncaster’s Civic & Cultural quarter.

This £8.5m project led by Doncaster Council is part of the Urban Centre Masterplan helping to revitalise the Waterdale area of Doncaster town centre.

Our team provided Building Services Engineering and BREEAM assessment for the project and were very pleased to join The Harris Partnership, Rex Procter & Partners, JPG Group and main contractor the Lindum Group on the project team.

Visitors to the new cinema will experience luxury recliner and rocker seating, Vertex viewing with next-generation 4K laser projection and Dolby Atmos immersive sound.

The project benefited from £635,000 in funding from the Sheffield City Region Local Growth Fund and is one of many projects contributing towards the wider regeneration of Doncaster and it is hoped that this new facility will create over 100 jobs

About This Project

5

CLIENT : Doncaster Council

5

ARCHITECT : The Harris Partnership

5

PROJECT VALUE : £8.5 million

5

CONTRACT DURATION: September 2018 - November 2020

Get in touch

6 + 14 =

Store Street, Manchester

Store Street, Manchester

Store Street, Manchester

PROJECT OVERVIEW

‘Store Street’ is a new build residential scheme comprising 63 one & two bed apartments and 3 town houses along the Ashton Canal, off Store Street in Manchester city center. The scheme is being delivered by housing provider Clarion and H20 Urban.
Once complete Clarion Housing will manage the scheme and the properties will be made available through shared ownership.

Hannan Associates were appointed to develop the MEP services design, undertake design stage Part L Compliance checks and to produce an Energy Statement in support of the planning application submitted to Manchester City Council.

Fifty percent of the car parking spaces will be supplied by electric vehicle charge points, with passive provision for the remaining 50% of spaces. Secure cycle storage has also been included and a proportion of ‘green space’ incorporated into the scheme design by provision of an accessible terrace area on the sixth level.

It is currently proposed that an ‘all-electric’ services strategy will be adopted for both the apartments and the town houses.

As a result of the anticipated update to Building Regulations and subsequent update to SAP methodology (SAP 10), which proposes an approximate 55% reduction in the CO₂ emissions factor for electricity as a result of ongoing decarbonisation of the grid; homes heated by direct electric systems will produce virtually the same CO₂ emissions as gas.

The carbon impact of electric based heating is therefore going to be more favorable in the coming years, which we are promoting on this development in order to future-proof the homes and contribute towards Manchester’s 2038 Net Zero Carbon Target.

H20 Urban is a joint venture between developer Bloc and the Canal & River Trust.

 

Planning Submitted for Store Street Manchester

 

About This Project

5

CLIENT : Clarion Housing Group with H20 Urban

5

ARCHITECT : AHR Architects

5

CONTRACT DURATION: April 2019 - ongoing

Get in touch

3 + 4 =

Valette Square, Salford

Valette Square, Salford

Valette Square, Salford

PROJECT OVERVIEW

Hannan Associates were part of the team to design and deliver the recently completed Valette Square, developed by The English Cities Fund – a joint venture between Homes England, Legal & General and Muse Developments.

The development includes 33 townhouses with a mix of 2, 3 and 4 bedrooms with private gardens and terraces. It is situated just off Chapel Street, a short walk to Manchester City Centre, Spinningfields, New Bailey, Peel Park and the River Irwell.

Hannan Associates provided Building Services Engineering consultancy for the new homes, including early stage MEP concept design, utility connections & diversions advice, initial Part L1A calculations, renewable energy technologies feasibility review and site inspection duties.

The design of the townhouses’ façade and orientation optimises natural daylighting and reduces the requirement of artificial lighting. Other design features include smart utility metering, occupant controlled zoned heating system, low energy light fittings, improved insulation to minimize heat loss & reduce utility bills and Integrated Virgin Media and BT telecoms infrastructure.

Other members of the team included Buttress Architects, Integra Consulting, Chroma and main contractor John Turner Construction Group. 

This is the fourth phase of residential development in the Chapel Street area by the English Cities Fund, which forms part of the wider Salford Central masterplan.  Other schemes include Vimto Gardens, Timekeepers Square and Carpino Place .

The development is named after French Impressionist painter Pierre Adolphe Valette known for his acclaimed paintings of Manchester and Salford. He was a teacher at the Manchester Municipal School of Art and is remembered as L. S. Lowry’s tutor.

About This Project

5

CLIENT : The English Cities Fund

5

ARCHITECT : Buttress Architects

5

CONTRACT DURATION: May 2018 - January 2021

Get in touch

3 + 14 =

Liverpool Waters

Liverpool Waters

Liverpool Waters

PROJECT OVERVIEW

Hannan Associates are very pleased to be part of the team delivering Peel Land and Property‘s Liverpool Waters Development.

Our team is currently providing strategic, procurement and cost advice for the infrastructure required to support and enable the whole of the development. Our work includes the identification of the utility requirements, appraisal of the fulfilment options and procurement.

This is a key role in the master planning team and involves liaison and negotiation with the local utility companies and commercial operators in the ever changing utilities market. We are also providing site wide advice on sustainability to assist with the development of a class leading location and assistance with planning submissions for individual plots.

Liverpool Waters involves the transformation of the city’s central and northern docks, regenerating a 60-hectare site to create a world-class, mixed use development on Liverpool’s waterfront. When complete the development will provide the city with much needed job opportunities and will strengthen the connection between the waterfront and the city centre.

Other members of the team include Project Manager & Quantity Surveyor Walker Sime and Masterplanners Planit IE .

Further details about Liverpool Waters.

 

New Project – Liverpool Waters

 

 

About This Project

5

CLIENT : Peel L&P

5

CONTRACT DURATION: September 2018 - ongoing

Get in touch

6 + 1 =

New Bailey, Salford

New Bailey, Salford

New Bailey, Salford

PROJECT OVERVIEW

We are delighted to be a part of English Cities Fund’s regeneration plans for ‘Salford Central’ – a 44 acre, £650 million regeneration scheme transforming a key part of the city.

It is an exciting new development area situated at the interface between Manchester and Salford and bordered by the main artery of the regenerated Chapel Street and the inner city ring road.

The development will provide leisure and business opportunities for organisations large and small across all sectors, and will expand the existing and extensive business district in this part of the city.

We are very proud to be part of the team delivering this exciting development. Projects include:

  • Two New Bailey Square – 188,500 sq ft state of the art office development – 50,000 sq ft of which is pre-let to Eversheds Sutherland
  • Three New Bailey – 157,000 sq ft state of the art office development pre-let to HM Revenue and Customs (HMRC)
  • Riverside House – 11,000 sq ft state of the art office development – now home to Muse Developments
  • The Slate Yard – 424 apartment build to rent scheme
  • Premier Inn Hotel  – 143 key hotel
  • NCP New Bailey – 700 space Multi Storey Car Park
  • NCP Stanley Street – 633 space Multi Storey Car Park

Further details about the New Bailey Development

Salford Central Five Years On

About This Project

5

CLIENT : The English Cities Fund

5

ARCHITECT : AHR, AHMM, Aedas RWHL, MAKE, Hawkins Brown

5

PROJECT VALUE : £650M

5

CONTRACT DURATION: 2012 - ongoing

Get in touch