Approval for Affordable Homes at New Bailey, Salford

Approval for Affordable Homes at New Bailey, Salford

Image Courtesy of ECF.

The latest and final residential scheme at New Bailey, Salford has secured planning permission. 

The scheme is set to deliver 189 affordable homes and once complete will take the total number of new homes delivered at New Bailey to 1,000. The development will sit amongst five other residential schemes, including: the three blocks at The Slate Yard; Novella; and Plot C2 which is currently under construction.

ECF are delivering the scheme as part of the wider £1bn regeneration of Salford Central. ECF is a joint venture between Muse, Legal & General and Homes England, in conjunction with Salford City Council.

Hannan Associates are very happy to be a part of the team working alongside Hawkins/Brown, Buro Four, DPP Planning, Walker Sime, Renaissance, Design Fire Consultants, Project Four, WSP and Re-form Landscape Architects. 

 

Image Courtesy of ECF

Hannan Associate’s Appointment

The Hannan residential team are providing Building Services Engineering consultancy services including:

  • Early-stage technical review and development of plant space options &
    requirements
  • Utilities coordination based on proposal to connect to existing
    infrastructure installed under the Phase 1 (C1 Novella) works. 
  • Building Regulations Part L Design Stage Compliance Assessments
  • Building Regulations Part O Limiting Overheating Analysis
  • TM54 Operational Energy calculations
  • Ongoing site inspections & reporting during the construction period

 

If you would like to talk to us about a future project please give us a call or drop us an email….

 

 

Andrew Carrington

Andrew Carrington

Director

Email: [email protected]
Phone: +44(0)161 337 2200

Cross Lane Salford

Novella, New Bailey

The Slate Yard, New Bailey

Blackpool Civil Service Hub Now Complete

Blackpool Civil Service Hub Now Complete

Image Courtesy of Joel Chester Fildes

Vinci Building have completed work on the new, £100m office building in Blackpool, which forms part of the third phase of the Talbot Gateway regeneration scheme led by Muse.

The seven storey, 215,000 sq ft office building is now home to over 3000 staff from the Department of Work and Pensions.

 

Image Courtesy of Joel Chester Fildes

Hannan Associate’s Appointment

Hannan Associates  provided Building Services Engineering Consultancy  on the project and our key duties included: 

  • MEP services CAT A & CAT B performance design duties
  • Passive design analysis
  • Low & zero carbon feasibility studies
  • Design for Performance Operational Energy Modelling via advanced dynamic simulation
  • Construction monitoring
  • BREEAM Assessor and Certification

The Building’s Green Credentials

The building has been designed to be low energy with passive measures prioritised to reduce energy demand. Low-carbon heating and cooling to the office has been provided via air source heat pumps and high efficiency chillers serving low specific fan power fan coil units. Demand control ventilation has also been provided via central air handling units incorporating heat recovery to improve indoor air quality while saving energy during periods of reduced occupancy. An extensive PV array has been provided.

Green outdoor spaces with Sustainable Urban Drainage have also been provided, enhancing local biodiversity and promoting staff health and wellbeing. Extensive Cycle Spaces and changing facilities reduce reliance on vehicle journeys, reducing associated transport emissions.

The bulding was designed to achieve BREEAM ‘Excellent’ certification and an Energy Performance Certificate rating of A. The Base Building operational energy is aligned with UK GBC’s interim NZC target for 2030 – 2035.

We are pleased to have been a part of Muse’s design team working alongside Make Architects, RPS, Chroma, Arup, Aecom and main contractor VINCI Building.

 

Blackpool Talbot Gateway Regeneration Scheme

Hannan Associates were also part of the team who designed and delivered Blackpool Council’s home, the award winning Bickerstaffe House. This first phase of development at Talbot Gateway, which started twelve years ago, also included the refurbishment of the 1930s, 5 level Talbot Road multi-storey car park.

The Talbot Gateway regeneration scheme is transforming Blackpool town centre and will comprise of a new business district and civic quarter, grade A offices, retail space, event space and a new public transport interchange. It is hoped that this new development will help to drive footfall in the town centre and support Blackpool’s economic growth.

 

Image Courtesy of Joel Chester Fildes

 

Offices Workspace Expertise

New Build :: Fit Out :: Retrofit :: Repurpose

Offices & workspace, in all forms, have been at the core of our business for over 40 years.

Whether it be speculativeoffices designed to attract potential tenants; a highly customised HQ; or the refurbishment of an existing building,our engineers understand what clients and occupiers expect and need from the 21st Century modern workplace.

Our extensive experience in this sector, along with continued training and research, means that we can contribute in-depth knowledge of a wide range of design solutions available for office environments and advice on cost in use.

 

If you would like to talk to us about a future project please give us a call or drop us an email….

 

 

Andrew Carrington

Andrew Carrington

Director

Email: [email protected]
Phone: +44(0)161 337 2200

Freetrade Exchange, Manchester

Blackpool Council Offices, Talbot Gateway

Coop HQ, One Angel Square, Manchester

Pin It on Pinterest