Industrial

Creating masterplans that help businesses evolve with confidence.

Industrial networks are the heart of a company. These spaces often require multiple uses such as manufacturing processes, storage facilities, distribution centres and logistic hubs. Requirements for such spaces are diverse and often highly complex, ranging from temperature control to creating transport links for direct site access.

No matter what specifications your product requires we can create the perfect place in which to get it from A to B.

How can we help you

Strategic design, cost planning and procurement of the masterplan and individual plot utilities

Development of base build unit specifications for marketing

Flexible design strategies for the base unit designs to widen the market appeal

Tenant liaison during negotiations to interpret and develop the MEP brief and costs

MEP designs for design and build tender

BIM implementation to meet developer or tenant requirements

Monitoring of Contractor design and construction

Assist with tenant sign off and handover
Liaison with funder appointed monitors during construction

Development of cost effective energy strategies for development sustainability

Planning liaison and negotiation on development wide issues and individual plots

BREEAM certification

Tenant liaison on sustainability

Omega Business Park, Warrington

Client: Miller Developments
Architect: Chetwood Architects
Project Value: £1 BN
Contract Duration: May 2012 – ongoing

Omega, a 226 ha site straddling the M62 near Warrington, is considered to be one of Europe’s most important strategic development sites. It will be a mixed-use development comprising offices, industrial space, leisure facilities and hotel and conference facilities. The development is expected to create over 12,000 jobs for the region with the development planned to take place over the next 25 years.

The site comprises a large part of the former RAF/ USAF Burtonwood Airbase and has two distinct areas, and incorporates five former aircraft hangars that remain from the former airfield use. The site is surrounded by land that is designated for use as statutory green belt which will be precluded from future development.

Hannan Associate’s duties for this project include utilities and MEP contribution to the master planning proposals, utilities infrastructure appraisal, strategy and procurement for the whole of the North and South sites. We provided MEP performance and monitoring duties for the OWL developed buildings including planning submission support, BREEAM assessment, utilities provisions for the tenant developed plots and pre and post exchange tenant liaison for the utilities.

We have also provided shell & core and fit out of distribution centres on Omega North for Brake Brothers, Hermes and Travis Perkins and on Omega South The Hut Group, Plastic Omnium and Dominos Pizza.

Client: Omega Warrington Ltd
Architect: Chetwood Architects
Contract Duration: November 2015 – Ongoing

Located at the south side of the Omega Business Park the facility for Dominos Pizza is a 117,000 sqft industrial building, consisting of a 11,141sq.ft GIA two storey office area, a gatehouse building constructed on a secured enclosed site, external car parking, HGV parking, and a service yard.

The building operates 24 hours a day, 7 days a week. The site and associated buildings were constructed to Cat B level of services, tailored to meet the specific needs of the building Tenant.

Performance duties (Stage 3a Developed Design) for Cat A and Cat B Works, were established on the Developers base building specifications, and Dominos enhanced Cat B fit-out to the Offices and Plant Areas, to suit the enhance fit-out works in preparation for the full Cat C manufacturing, storage and distribution plant fit-out to the warehouse.

Additional duties included the monitoring of the MEP design contractors technical design solutions, construction works on site, and final testing and inspections for handover of the works to the Cat C fit-out contractors.

Dominos, Omega Business Park Warrington

Brake Brothers, Omega Warrington

Client: Miller Developments
Architect: Chetwood Architects
Project Value: £24m
Contract Duration: May 2012 – ongoing

Brakes Brothers became the first business to take up residence in the Omega Business Park, upon completion of their 200,000 sq ft state of the art cold storage logistics centre. The development takes up a quarter of the Omega North site based to the north of the M62. The building is designed to be at a constant temperature of -26c, to ensure stored food remains fresh before being delivered across the country.

Hannan Associates provided MEP design services for this project that involved the construction of a single storey industrial building, with ambient, chilled and frozen environments and a 15,000sq.ft, two storey office building.

The building has been constructed on a secured enclosed site with external car parking, HGV parking, service yard, goods-in, goods-out, gatehouse, fuel storage and filling point and vehicle wash.

Client: Miller Developments
Architect: Chetwood Architects
Project Value: £14.5m
Contract Duration: May 2012 – October 2014
The handover of the Travis Perkins regional distribution centre marked the completion of more than a million sq ft of development on the north side of the Omega Warrington Business Park.

This project involved the construction and part fit out of their c630,000 sq ft regional distribution centre with support offices, car parking, vehicle and a future expansion site.

The project involved shell & core mechanical and electrical services to the warehouse, 19,000 sq ft two storey office building and 10,000sq ft two storey office pod with external car parking HGV parking, service yard, gatehouses, drivers welfare building, fuel storage & filling point and vehicle wash.

Heating and hot water to the office core areas was provided via air source heat pumps serving low temperature hot water.

Travis Perkins, Omega Warrington

Hermes, Omega Warrington

Client: Miller Developments
Architect: Chetwood Architects
Project Value: £14.5m
Contract Duration: May 2012 – April 2014

This project involved the construction and fit out of a c150,000 sq ft cross dock automated parcel sorting facility for Hermes at plot 1A, Omega North, Warrington.

The building includes office accommodation, a vehicle maintenance unit, a warehousing facility, and two gatehouses. The site area is 18.43 acres with the provision of 275 car parking spaces and 262 HGV parking spaces.

Our services included infrastructure services and MEP design associated with the landlords CAT A works and tenant enhancement CAT B works for the construction and fit out of a c150,000 sq ft cross dock automated parcel sorting facility with c16,000 sq ft two storey offices, external car parking, HGV parking, service yard, fuel storage & filling point and vehicle wash.

Warehouse heating was provided via gas-fired radiant heating with gas fired boiler plant serving radiators within the office area.

Liaison with the tenant was undertaken regarding the proposed CAT C works to ensure co-ordination of the power and water supplies, drainage etc for the intended fit-out works of the automated parcel sorting machinery.

Client: Miller Developments
Architect: Chetwood Architects
Project Value: £32m
Contract Duration: May 2012 – December 2014
The Hut Group’s new premises on a 41 acre plot at Omega South, supports a mixture of functions including logistics, manufacturing, and offices, plus a further 150,000 sq ft of additional expansion land.

The project included the construction and fit out of a 650,000 sq ft production, storage and distribution facility which includes vitamin supplement production, automated and manual order processing studio and support offices.

The new premises were built to consolidate The Hut Groups four existing UK distribution units. The facility is used to satisfy both its domestic and rapidly growing international operations.

We provided MEP Design services CAT A fit-outs to the warehouse and 17,000 sq ft two storey office building, 11,000 sq ft two storey production office and transport office with gatehouse, external car parking, HGV parking and service yard.

Air source heat pumps provided heating and comfort cooling to the office areas with sprinkler protection provided to the warehouse and office areas.

The Hut Group, Omega Warrington

Plastic Omnium

Client: Miller Developments
Architect: Chetwood Architects
Project Value: £14.5m
Contract Duration: May 2012 – April 2014

A new purpose building manufacturing facility at Omega South, across a site area of c20acres. Our services included infrastructure and MEP design associated with the landlords CAT A works, and tenant enhancement CAT B works, for the construction and fit out of a c235,000 sq ft state of the art manufacturing facility with c21,000 sq ft two storey offices, external car parking, HGV parking and service yard. Air source heat pumps provided heating and comfort cooling to the office areas with sprinkler protection to NFPA standards provided to the warehouse and office areas.

Liaison with the tenant was undertaken regarding the CAT C works to ensure co-ordination of utility supplies, drainage etc with the intended fit-out works of the automation manufacturing machinery.

Client: Miller Developments
Architect: Chetwood Architects
Contract Duration: May 2012 – ongoing
Utility services for the £100m, 600,000 sq ft Asda Distribution warehouse, the first
development on the Omega South site.

Asda, Omega Warrington

Galaxy Distribution Centre, Knowsley

Client: Maro Developments
Architect: Fletcher Rae Architects
Project Value: £22m
Contract Duration:January 2012 – April 2014

The Galaxy Distribution Centre was originally commissioned circa 2010 as a speculative industrial unit of 550,000 sq ft, with the
facility to extend in the future.

In 2013 as part of a major redevelopment of the site and adjacent land, the building was extended to provide a new ‘Major Logistics’ facility for fashion retailer Matalan, with the adjacent site becoming the new home for their corporate headquarters.
The original building was extended to provide an additional 150,000sq ft of storage space, as well as Transport Offices, servicing, a new Gatehouse, and ‘off site’ highways infra-structure works.

An extended Amenity Building was created to incorporate offices, training suites, canteen and changing rooms. The warehouse included a new automated single picking system and storage facility. Hannan Associates were engaged to design the extensions and alterations to accommodate the specialist fitting out of the new warehouse facility and to alter and adjust the infrastructure of the building to accommodate the fitting out.

Client: Muse Developments
Architect: Fletcher Rae Architects
Project Value: £5m
Contract Duration: April 2014 – May 2016
We provided utilities infrastructure master planning and procurement for the overall development proposals and design and monitoring services for the MEP associated with the initial speculative 80,000 ft² industrial unit. As part of the team we
contributed to the specification of the unit which was developed to provide a wide tenant appeal and a high level of flexibility to attract potential tenants. The unit is now let to Amazon and we assisted the client during the letting of the unit and carried out the design and monitoring of additional car parking facilities requesting by Amazon.

Logic Leeds is part of the Leeds Enterprise Zone, which means that it benefits from a range of incentives for occupiers. Overall
there is outline planning for 1.6 million ft² of quality industrial, storage and distribution development. All buildings will have a
high BREEAM rating and state-of-the-art facilities.

Amazon, Logic Leeds Business Park

John Lewis, Logic Leeds Business Park

Client: Muse Developments
Architect: Fletcher Rae Architects
Project Value: £6.2m
Contract Duration:March 2015 – May 2016

The building was constructed to meet the pre let requirements of John Lewis for a new 50,000 ft² customer delivery distribution hub. The building design and handover information was carried out using BIM protocols in accordance with John Lewis requirements.

Our role involved assisting the client with tenant liaison and the development of the brief with the John Lewis team. We were
responsible for the infrastructure procurement and the provision of a Stage 3+ design and performance specification for the MEP systems. We monitored the contractor design stages and construction of the works through to handover to ensure compliance with the strict tenant requirements.

Client: Phillips 66
Architect: Frank Shaw Associates
Contract Duration: January 2011 – May 2012
Construction of a new blast and toxic gas resisting building comprising of a warehouse, fabrication workshop, maintenance workshop and two storey office facility at the Humber Refinery, South Killingholme – 5,874m2 gross area. Steam and electricity were supplied from ConocoPhillips own Combined Heat & Power plant to serve the building.

Our duties included the outline design and performance specification of the building services installations to meet Conoco Phillips technical standards which are exacting due to the nature of the facility.

Phillips 66, South Killingholme

Manchester Airport Development

Client: Christal Management & MAG Developments
Architect: RPS Group
Project Value: £800m
Contract Duration:June 2007 – December 2010

We were involved in two projects with MAG Property and Christal Management at Manchester Airport. The projects involved the proposed development of new transit, logistics and freight forwarding warehouses adjacent to the main airport. Currently the plans have been developed to planning stage. We have also previously provided building services consultancy for a F.D.S Service hangar extension and a British Airways Services Hanger for Manchester Airport
Client: Hellerman Tyton & DT
Architect: DTZ
Contract Duration: 1999 –2001 & 2007 –2008
Hannan Associates provided Detailed Design of the Mechanical & Electrical Services for this new build factory for Hellerman Tyton.

During June 2007 Hannan Associates were appointed to undertake building services consultancy for the extension of this factory.

Hellerman Tyton, Manchester

Volkswagon Warehouse, Dordon

Client: TNT for the Volkswagen Group
Project Value: £21m
Contract Duration: October 2007 – October 2008

The project comprises 1 Million ft2 of narrow and very narrow aisle new build warehouse and administration space to act as the main hub for VWG’s UK parts distribution facility in Dordon and Warwickshire Ancillary buildings included an explosives store, parts return, vehicle maintenance workshop and security lodge.
Client: The Authentic Food Company

Contract Duration:April 2002 – April 2004

For this project we undertook the M&E Infrastructure Design for the fit out of a new production facility for The Authentic Food Company at Sharston Green Business Park in Manchester.

Authentic Foods Company, Sharston

Walker Park, Blackburn

Client: Bilsdale Properties
Project Value: Unknown
Contract Duration: June 1990 – July 2007