Symmetry Park, Kettering
PROJECT OVERVIEW
The Hannan Industrial team are providing building services engineering consultancy for Symmetry Park, Kettering.
The park has outline planning permission for 2.3 million sq ft of logistics floor space.
Unit 1 – Greggs PLC, new national distribution centre is a 311,000 sq ft cross dock logistics facility, completed in 2025. The facility was developed to Net Zero Carbon in Construction standards and achieved BREEAM Excellent certification and an EPC A rating.
Unit 2 – a 321,875 sq ft facility, completed in 2023 and is occupied by Iron Mountain.
Unit 3 – a 956,000 sq ft facility, has reached practical completion and is pre-let to Amazon on a 20-year lease. The facility is Amazon’s largest UK cross-dock warehouse and is expected to support around 2,000 jobs once fully operational. It has been delivered to a Grade A specification, achieving BREEAM Excellent certification and an EPC A rating, while meeting Net Zero Carbon in Construction standards.
We are very pleased to join Stephen George and Partners, Framptons, Feasibility Limited, Trinity Property Consultants, WSP UK , EPC UK on the project design team.
The site is situated directly alongside the A14 “Trans-European” freight route at Junction 9, offering occupiers prominence and excellent transport links to the national motorway and trunk road network.